Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.5 LAdmitted-Finance | -34.20% | ₹34.5 L | L1 | Admitted-Finance |
| 2 | L2₹38.0 L+₹3.5 L (10.0%)Admitted-Finance | -27.61% | ₹38.0 L+₹3.5 L (10.0%) | L2 | Admitted-Finance |
| 3 | L3₹38.4 L+₹3.9 L (11.3%)Admitted-Finance | -26.75% | ₹38.4 L+₹3.9 L (11.3%) | L3 | Admitted-Finance |
Tender Value
₹52.4 L
EMD Value
₹1.0 L
Closing Date
7 Aug 2026, 4:00 pmClosed
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Higher Secondary School Shahgund (Construction of Biology, Chemistry and Physics Room at Higher Secondary School Shahgund Zone Hajin Bandipora).
2026_PWDJK_318994_1
NIT NO 38 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
180 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Executive Engineer RnB DIVISION SUMBAL
₹1.0 L
11 Aug 2026
1 Aug 2026
8 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, in all kinds of soil | 116.79 | cum | 187.3 | ₹21,874.77 |
| 2 | Providing and laying Stone solling Hand packed including compacting, watering including all carriages of material complete. | 62.49 | cum | 1,000 | ₹62,490 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level (1:4:8) (1Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size) | 12.29 | cum | 5,202.9 | ₹63,943.64 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)incl all carriages 20mm nominal size) Crushed. (All Works up to Plinth level) raft | 55.59 | cum | 7,275.25 | ₹4,04,431.15 |
| 5 | Providing/laying in position specified grade excluding the cost of centering & shuttering . (M-15 Mix) 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded stone aggregate 20mm nominal size- crushed.) | 12.57 | cum | 6,591.25 | ₹82,852.01 |
| 6 | Filling available excaveted earth in trunchs , plinth sides of foundation in layers not exceding 20cm in depth consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m | 72.93 | cum | 218.4 | ₹15,927.91 |
| 7 | Filling inside rooms by 2nd class san / stone dust /qurry muck etc in layers incl. ramming and watering etc complete job | 42.49 | cum | 1,000 | ₹42,490 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in: 1:6 (1 cement and 6 coarse Sand ) in superstructure above plinth level upto first floor level | 50.34 | cum | 9,027.2 | ₹4,54,429.25 |
| 9 | Providing and fixing of wood work in frames of door/ window /arch windows /ventilator wrought frames (chowkats) imported Kd Wood. | 3.08 | cum | 58,000 | ₹1,78,640 |
| 10 | Providing and fixing 32 x5mm flat iron hold fast including fixing of frames with nuts and bolts. | 74 | No | 50 | ₹3,700 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1054289.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .