Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-Finance | ₹8.4 L | 1 | Accepted-Finance Accepted |
| 2 | Rejected-Technical GOA | - | - | Rejected-Technical ARN not valid |
Tender Value
₹8.0 L
EMD Value
₹15,954
Closing Date
27 Jul 2026, 3:00 pmClosed
SARPANCH
VILLAGE PANCHAYAT MORLEM SATTARI
Construction of Agarshala at Anjunem Temple Shree Sateri Kelbai Devasthan at Survey No 4 1 at Anjunem Morlem in V P Morlem Sattari Goa under G I A fund
2026_VP_30404_1
VP/Morlem/SAT/e-TENDER NOTICE/2026-27/556
Open Tender
Civil Works
Works
VILLAGE PANCHAYAT MORLEM SATTARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹15,954
Yes
31 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | a All kinds of soil | - | m3 | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and foundation complete. | 1 | m3 | - | - |
| 3Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 4 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 1 | m3 | - | - |
| 5 | Extra for Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level | 1 | m3 | - | - |
| 6Providing and fixing vitrified matt finished (600x600) and 10mm thick tiles in floor, treads of steps, landing on 25mm thick bed of cement mortar 1:3 and jointed with cement slurry complete. | |||||
| 7Providing 25 mm thick cuddapah slabs machine cut and polished on either side in partitions including making necessary grooves in the wall and fixing with cement mortar, complete as directed by the engineer-in-charge | |||||
| 8Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 8.01 | All works upto plinth level | - | cu.m | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_30816.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].