| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | ₹13.5 L | L1 | Accepted-AOC Lowest amount quoted for AOC |
| 2 | L2₹15.0 LRejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹15.0 L | L2 | Rejected-Finance Highest amount quoted |
| 3 | L3₹15.1 LRejected-Finance | ₹15.1 L | L3 | Rejected-Finance Highest amount quoted |
| Sl No | Description | Qty | Unit | adhiyaninfra L1 | SANKAR L2 | MR.S. GANESHMOORTHI L3 |
|---|---|---|---|---|---|---|
| 1.00Reconstruction of Sluice No-2 in Erandumchollankulam in Kattarankulam Panchayat at Manur Panchayat Union | ||||||
| 2.00 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) metres high complying with standard specification and as directed by the Engineer. | 37.98 | M3 | 200 ₹7,596 Lowest | 302.96 ₹11,506.42 | 320 ₹12,153.6 |
| 3.00 | Dismantling,clearing away and carefully stacking materials useful for reuse for any thickness of plain cement concrete complying with standard specification and as directed by the Engineer | 9.6 | M3 | 400 ₹3,840 Lowest | 520.23 ₹4,994.21 | 550 ₹5,280 |
| 4.00 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi | 106.66 | M4 | 200 ₹21,332 | 127 ₹13,545.82 Lowest | 150 ₹15,999 |
| 5.00 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi | 137.29 | M3 | 300 ₹41,187 | 263.78 ₹36,214.36 Lowest | 300 ₹41,187 |
| 6.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 10.6 | M3 | 1,500 ₹15,900 Lowest | 1,846.42 ₹19,572.05 | 1,850 ₹19,610 |
| 7.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 35.01 | M3 | 4,500 ₹1,57,545 Lowest | 5,351.63 ₹1,87,360.57 | 5,370 ₹1,88,003.7 |
| 8.00 | Centring shuttering the sides with necessary supports as per standard specifications including all labour charges etc complete | 458.53 | M2 | 300 ₹1,37,559 Lowest | 547.5 ₹2,51,045.18 | 550 ₹2,52,191.5 |
| 9.00 | Deck slab | 26.13 | M2 | 1,200 ₹31,356 | 1,095 ₹28,612.35 Lowest | 1,100 ₹28,743 |
| 10.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 52.8 | M3 | 8,000 ₹4,22,400 | 6,642.68 ₹3,50,733.5 Lowest | 6,650 ₹3,51,120 |
Tender Value
₹18.6 L
EMD Value
₹18,600
Closing Date
10 Jul 2026, 4:00 pmClosed
The President, Kattarankulam Panchayat
The President, Panchayat Office Kattarankulam Panchayat
Reconstruction of Sluice No-2 in Erandumchollankulam in Kattarankulam Panchayat at Manur Panchayat Union
2026_RDTN_682600_1
Kattarankulam 01/26-2
Open Tender
Civil Works
Fixed Rate Contract
The Panchayat office, Kattarankulam Panchayat
Refer Tender Documents
2 documents required · 2 mandatory
₹0
₹18,600
28 Jul 2026
24 Jun 2026
10 Jul 2026
24 Jun 2026
10 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reconstruction of Sluice No-2 in Erandumchollankulam in Kattarankulam Panchayat at Manur Panchayat Union | - | - | - | - |
| 2 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) metres high complying with standard specification and as directed by the Engineer. | 37.98 | M3 | - | - |
| 3 | Dismantling,clearing away and carefully stacking materials useful for reuse for any thickness of plain cement concrete complying with standard specification and as directed by the Engineer | 9.6 | M3 | - | - |
| 4 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi | 106.66 | M4 | - | - |
| 5 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi | 137.29 | M3 | - | - |
| 6 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 10.6 | M3 | - | - |
| 7 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 35.01 | M3 | - | - |
| 8 | Centring shuttering the sides with necessary supports as per standard specifications including all labour charges etc complete | 458.53 | M2 | - | - |
| 9 | Deck slab | 26.13 | M2 | - | - |
| 10 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 52.8 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_820529.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].