Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAccepted-Finance | ₹48.8 L | L1 | Accepted-Finance Accept |
| 2 | L2₹52.5 L+₹3.8 L (7.69%)Rejected-Finance VILLAGE NER PO MANJHU TEHSIL ARKI DISTT SOLAN H P | ARKI | SOLAN | HIMACHAL PRADESH | ₹52.5 L+₹3.8 L (7.69%) | L2 | Rejected-Finance Reject |
| 3 | L3₹57.4 L+₹8.6 L (17.7%)Rejected-Finance | ₹57.4 L+₹8.6 L (17.7%) | L3 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Madho Ram Govt. Contractor H1 | Pushpender Bhargav H2 | Chetan Thakur H3 |
|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||||
| 1.01 | Operation and Maintenance of STP Arki 0.7 MLD capacity with Primary Treatment Units having Inlet Chamber,Screens and Grit Channel ,Secondary treatment units (Aeration Basin) and Tertiary Treatment Units (RPSF&ACF) as exists on site with related electromechanical equipments and laboratory in the existing plant Building with a sewerage network of 11.00 KM in and around the Kunihar Town in various dia. of pipes and manholes for a period of three years from the day of taking over of the plant .The rate quoted shall be inclusive of the contractor profit and taxes like GST, Income tax etc and including the cost of getting the effluent samples collected & tested from NABL/HP Govt. recognized third party laboratories. ( Read annexure-A) | 1.5 | Per Year | 38,26,000 ₹57,39,000 | 35,00,000 ₹52,50,000 | 32,50,000 ₹48,75,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
1 Jul 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Arki
Deployment of labour_staff for operation running and maintenance of 0.70 MLD capacity STP including sewerage network system to Arki Town for a period of 18 Months in 3rd Call
2026_HPIPH_137235_7
ARK-SOL01-425-8213-63
Open Tender
Civil Works
Item Rate
540 days
Arki
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹1.2 L
9 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Operation and Maintenance of STP Arki 0.7 MLD capacity with Primary Treatment Units having Inlet Chamber,Screens and Grit Channel ,Secondary treatment units (Aeration Basin) and Tertiary Treatment Units (RPSF&ACF) as exists on site with related electromechanical equipments and laboratory in the existing plant Building with a sewerage network of 11.00 KM in and around the Kunihar Town in various dia. of pipes and manholes for a period of three years from the day of taking over of the plant .The rate quoted shall be inclusive of the contractor profit and taxes like GST, Income tax etc and including the cost of getting the effluent samples collected & tested from NABL/HP Govt. recognized third party laboratories. ( Read annexure-A) | - | Per Year | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
ANNEXURE-A.pdf
Tender Documents • 0.15 MB
BOQ_203117.xls
BOQ • 0.34 MB
For_6_STP_Arki.pdf
Tender Documents • 0.47 MB
Form_8_STP-Ark.pdf
Tender Documents • 1.44 MB
TERM_Condition_STP_Arki.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .