Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.4 L+₹2,248.22 (0.93%)Admitted-Finance NAI SARAI RAMGARH CANTT DISTT RAMGARH PIN 829122 | RAMGARH | JHARKHAND | 829122 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical not accepted for further evaluation |
| Sl No | Description | Qty | Unit | M/S R N ENTERPRISES L2 | M/S S.P. ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Cost of Primary & Secondary Copper Wire & Strip DPC | 80 | kg | 1,713 ₹1,37,040 | 1,697 ₹1,35,760 Lowest |
| 2.00 | Cost of Insulating Material 15% of Sl. No. 1 | 1 | job | 20,556 ₹20,556 | 20,364 ₹20,364 Lowest |
| 3.00 | Installation charge 15% | 1 | job | 23,639 ₹23,639 | 23,418.6 ₹23,418.6 Lowest |
| 4.00 | Less Scrap Value 60% of Sl. No. 1 | 1 | job | 82,224 ₹-82,224 | 81,456 ₹-81,456 Lowest |
| 5.00 | Providing & fixing of HT bushing with stud with nut washer. | 3 | No. | 9,482 ₹28,446 | 9,396 ₹28,188 Lowest |
| 6.00 | Providing & fixing of LT bushing with stud wirh nut washer. | 4 | No. | 7,171 ₹28,684 | 7,106 ₹28,424 Lowest |
| 7.00 | Providing & fixing of Cork sheet | 2 | No. | 3,442 ₹6,884 | 3,410 ₹6,820 Lowest |
| 8.00 | Providing & fixing of Brether with Silika Gel | 1 | No. | 10,591 ₹10,591 | 10,495 ₹10,495 Lowest |
| 9.00 | Providing & fixing of GI Pipe with accessories | 1 | No. | 3,658 ₹3,658 | 3,625 ₹3,625 Lowest |
| 10.00 | Oil Drainup & oil Topup. | 1 | No. | 3,863 ₹3,863 | 3,828 ₹3,828 Lowest |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
24 Aug 2026, 5:00 pmClosed
P.E. (EnM)
Colliery Manager (M), Dy. Manager (F), P.E. (EnM)
Repairing / rewinding of 100KVA transformer and welding machine under Birsa Project.
2026_CCL_363582_1
PE(EnM)/BIRSA/ETENDER/26-27/04
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
Birsa Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,300
1 Oct 2026
12 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
13 Aug 2026 - 16 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of Primary & Secondary Copper Wire & Strip DPC | 80 | kg | - | - |
| 2 | Cost of Insulating Material 15% of Sl. No. 1 | 1 | job | - | - |
| 3 | Installation charge 15% | 1 | job | - | - |
| 4 | Less Scrap Value 60% of Sl. No. 1 | 1 | job | - | - |
| 5 | Providing & fixing of HT bushing with stud with nut washer. | 3 | No. | - | - |
| 6 | Providing & fixing of LT bushing with stud wirh nut washer. | 4 | No. | - | - |
| 7 | Providing & fixing of Cork sheet | 2 | No. | - | - |
| 8 | Providing & fixing of Brether with Silika Gel | 1 | No. | - | - |
| 9 | Providing & fixing of GI Pipe with accessories | 1 | No. | - | - |
| 10 | Oil Drainup & oil Topup. | 1 | No. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_376480.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .