| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹1.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹33.0 L (26.8%)Rejected-AOC SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | ₹1.6 Cr+₹33.0 L (26.8%) | 2 | Rejected-AOC L2 |
Tender Value
₹1.4 Cr
EMD Value
₹2.5 L
Closing Date
27 Mar 2020, 3:30 pmClosed
SE PURCHASE AND WORK SSTPP DONGALIA
FLOOR 3RD ADMIN BUILDING SE PURCHASE AND WORK SSTPP DONGALIA
Annual Overhauling of Boiler Pressure part of unit 1 and 2 at 2x600MW, SSTPP, MPPGCL, Dongalia Distt Khandwa
2020_MPPGC_77363_1
WT-1031
Open Tender
Miscellaneous Works
Item Rate
366 days
SE PURCHASE AND WORK SSTPP DONGALIA
As per NIT
18 documents required · 18 mandatory
₹5,000
Payable To
₹2.5 L
Yes
12 Mar 2022
11 Feb 2020
30 Mar 2020
11 Feb 2020
27 Mar 2020
11 Feb 2020
SECTION-A (SrNo. 1.00 to 1.17)
COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM
INTERNAL CLEANING OF BOILER IN IIND PASS
CLEANING OF ASH FROM ECONOMISER HOPPER & DEAD CHAMBER
CLEANING OF PENT HOUSE, CAT HOUSE
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES)
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE
PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF STRAINERS & ORIFICES.
INSPECTION OF COMPLTE BOILER PRESSURE PARTS (IST & IIND PASS)
INSPECTION OF REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
Preparation of Scaffolding in WIND BOX
CLEANING AND REPAIR OF WIND BOX
SERVICING OF SECONDARY AIR DAMPERS
PREPARATION OF SCAFFOLDING IN CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING, REPAIRING
Dye Penetration Test (DP Test)
Transportation of Ash, Scraps, Debries and other waste materials ( including loading/unloading)
Preparation of Scaffolding in Bottom Ash Hopper
SECTION-B (SrNo. 2.00 to 18.00)
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE 9SHIELDING)/CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY
WELDING OF HP JOINTS OF BOILER TUBES
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
LTSH TUBES
ECONOMISER SUPPORT TUBES
LTSH SUPPORT TUBES
SUPERHEATER STEAM COOLED SPACER TUBES
Reheater Front & Rear
Roof Tubes
REHEATER CROSS OVER TUBES
REHEATER STEAM COOLED TUBES
Lower /Upper Corner Transition Tubes
REPLACEMENT OF WW BURNER TUBES
ECONOMISER TUBES
ALIGNMENT OF TUBES OF SH DIVISIONAL PANEL
ALIGNMENT OF TUBES OF PLATEN SUPERHEATERS
ALIGNMENT OF COIL OF ECONOMISER
ALIGNMENT OF COIL OF LTSH
ALIGNMENT OF REHEATER COIL
WELDING OF FINS
RE-ENFORCEMENT OF WELDED JOINTS
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50mmX150mm)
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
CHECKING AND RECTIFICATION OF SUPPORTS/HANGERS OF CRITICAL PIPE LINES
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (Gr.a+Gr.C)
BOTTOM ASH HOPPER GR-C
PENT HOUSE ( Inside & outside) , DOORS & WINDOWS ETC. GR.-C
MAN HOLES, PEEP HOLES GR-A
Flue gas erosion protection plate of LTSH & ECO Bends (Gr.C)
Soot Blower Area (Gr.A)
HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
SECTION -C COMPLETE SERVICING/OVERHAULING OF HP VALVES(SrNo. 19.00 to 21.00)
GLAND PACKING OF HP VALVES
Upto 25 mm
25 mm to 50 mm
50mm to 100 mm
100 mm to 200 mm
Above 200 mm
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
Upto 25 mm
25 mm to 50 mm
50 mm to 100 mm
100 mm to 200 mm
Above 200 mm
REPLACEMENT OF VALVES (WELDED TYPE)
Upto 25 mm
25 mm to 50 mm
50 mm to 100 mm
SECTION -D COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES
BOILER DRUM SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
ELECTROMATIC RELIEF VALVE AND PILOT VALVE
SECTION -E (SrNo. 23.00 to 25.00)
PREPARATION OF HP TUBE BENDS
REPAIR AND RE-FIXING OF SEAL PLATES/COOLING PIPE OF WATER WALL S-PANEL AT TROUGH SEAL.
REPAIR AND RE-FIXING/LAYING OF REFRACTORY ON COOLING PIPE OF BOTTOM ASH HOPPER.
REPAIR OF PENT HOUSE OF BOILER
Repair of Pent house by patching
Dismanteling of Steel Structures/Installation of new steel structures
REPAIRING OF DEAD CHAMBER
Repair of Dead Chamber by patching
Dismanteling of Steel Structures/Installation of new steel structures
SECTION -F
ALIGNMENT OF WALLBLOWERS/SERVICING OF WALL BLOWERS
ALIGNMENT /SERVICING OF LONG RETRACTABLE SOOT BLOWER
SECTION -G
SERVICING OF MAIN STEAM STOP VALVE
SECTION-H
CLEANING OF EMEGENCY COOLING WATER SUPPLY TANK FOR BCW MOTOR
SECTION-I
Fixing of Corrugated GI Sheet at Boiler Roof & other places
Supply of Corrugated Sheet [Size- 1.2mm (Thk.)X750mm (Width)X2500 mm(Length)]
Economizer Inlet Non-Return Valve (NRV) servicing ( Size-550 MM)
Inspection of Complete Desuperheater Assly. Of Superheater
K K POWER CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .