| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 CrAccepted-AOC 711 S S T NAGAR PATIALA PUNJAB 147001 91 99150 03011 | L1 | Accepted-AOC Due to lowest bid price | |
| 2 | L2₹25.4 Cr+₹1.1 Cr (4.50%)Rejected-Finance | L2 | Rejected-Finance Due to high bid price | |
| 3 | L3₹25.6 Cr+₹1.3 Cr (5.41%)Rejected-Finance | L3 | Rejected-Finance Due to high bid price | |
| 4 | L4₹30.8 Cr+₹6.5 Cr (26.8%)Rejected-Finance | L4 | Rejected-Finance Due to high bid price |
Tender Value
₹28.2 Cr
EMD Value
₹56.4 L
Closing Date
9 Jan 2026, 12:00 pmClosed
Executive Engineer
Provincial Division PWD BandR DAC Complex Sangrur
Construction of Sports Complex Sunam, Distt. Sangrur (Punjab)
2025_CEPW_156128_1
Bid No 77 Dt. 19-12-2025
Open Tender
Civil Works - Buildings
Percentage
450 days
Sangrur
Please refer Tender documents.
7 documents required · 7 mandatory
₹50,000
₹56.4 L
Yes
Sangrur
9 Feb 2026
20 Dec 2025
9 Jan 2026
20 Dec 2025
9 Jan 2026
20 Dec 2025
2 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS:-
Construction of Boys Hostel:-
Earth filling under floors with surplus ordinary soil or soil containing gravel or
kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres and Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. (As per CSR Item No.6.8 a (i) + 6.19) | 1,912.2 | Cum | 102.19 | ₹1,95,407.72 |
| 2 | Cement Concrete 1:5:10 with stone ballast of size. 40 mm guage. using concrete mixing volumetric type | 131.71 | Cum | 4,408.1 | ₹5,80,590.85 |
| 3 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 494.43 | Cum | 6,414.66 | ₹31,71,600.34 |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 1,186.23 | Sqm | 221.24 | ₹2,62,441.53 |
| 5 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 322.66 | Cum | 6,268.21 | ₹20,22,500.64 |
| 6 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 1,089.14 | Cum | 7,204.78 | ₹78,47,014.09 |
| 7 | Extra Rate For First Floor | 48.03 | Cum | 190.68 | ₹9,158.36 |
| 8 | Extra Rate For Second Floor | 48.03 | Cum | 381.37 | ₹18,317.2 |
| 9 | Extra Rate For Third Floor | 48.03 | Cum | 572.05 | ₹27,475.56 |
| 10 | Extra Rate For Fouth Floor | 48.03 | Cum | 762.73 | ₹36,633.92 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_316757.xls
BOQ • 2.61 MB
SBD.pdf
Tender Documents • 28.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .