| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAdmitted-Finance | ₹8.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.5 Cr+₹61.1 L (6.84%)Admitted-Finance D 5 CC COLONY DELHI 7 | ₹9.5 Cr+₹61.1 L (6.84%) | L2 | Admitted-Finance |
| 3 | L3₹11.1 Cr+₹2.2 Cr (24.6%)Admitted-Finance | ₹11.1 Cr+₹2.2 Cr (24.6%) | L3 | Admitted-Finance |
| 4 | L4₹12.4 Cr+₹3.5 Cr (39.1%)Admitted-Finance | ₹12.4 Cr+₹3.5 Cr (39.1%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MITTAL BROTHERS ENGINEERS AND L3 | AMIT CONSTRUCTION Co. L2 | TRG Industries Private Limited L1 | M/S Krishna Associate L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (CSI No. 4.01) | 2,826 | Cum | 200 ₹5,65,200 | 80 ₹2,26,080 Lowest | 400 ₹11,30,400 | 190 ₹5,36,940 |
| 2.00 | Add to Earth work item no. 01 (CSI No. 4.01) for every additional 30m lead or part thereof or for every additional 1.5M lift or part thereof. (CSI No. 4.04) | 2,826 | Cum | 50 ₹1,41,300 | 20 ₹56,520 Lowest | 100 ₹2,82,600 | 28.8 ₹81,388.8 |
| 3.00 | Providing and laying cutting edge of MS Angle iron & plates of SAIL/ TISCON for well foundation complete as per drawing and technical specifications including supply of all material, straightening, bending, welding, labour, tools and tackels plants & equipments with primer and painting etc complete as required for successful completion of the work. (NSI) | 7 | MT | 1,25,000 ₹8,75,000 | 1,15,000 ₹8,05,000 | 1,50,000 ₹10,50,000 | 1,12,580 ₹7,88,060 Lowest |
| 4.00 | RCC work in well Curb with concrete mix 1:1:2 (one part O.P.C. cement (not less than 550Kg per Cum.) one part of coarse sand chopan (khadan F.M. 2.0 to 2.5) and two parts 20 mm graded hard stone ballast including shuttering and placing, fixing and binding of reinforcement bars with 24 BWG binding wire in proper position as per approved drawing including placing of concrete and compacting the same with vibrators with cost of all materials labour and T&P complete. This concrete must give strength equivalent or more than M-25 grade concrete. (NSI) | 150 | Cum | 12,500 ₹18,75,000 | 14,000 ₹21,00,000 | 12,000 ₹18,00,000 Lowest | 13,495.68 ₹20,24,352 |
| 5.00 | RCC work in Well steining and well cap with concrete mix 1:1.5:3 (One part O.P.C. cement not less than 400Kg per Cum.), one & half parts coarse sand Chopan (Khadan F.M. 2.0 to 2.5) and three parts 20 mm graded hard stone ballast including proper shuttering and placing, fixing and binding the reinforcement bars with 24 BWG binding wire in proper position as per approved drawing including placing of concrete and compacting the same with vibarators with cost of all materials,labour and T&P complete. This concrete must give strength equivalent or more than M-20 grade concrete. (NSI) | 5,495 | Cum | 12,000 ₹6,59,40,000 | 11,200 ₹6,15,44,000 | 10,600 ₹5,82,47,000 Lowest | 12,209 ₹6,70,88,455 |
| 6.00 | Plain CC work in bottom plug of the well with concrete mix 1:1.5:3 under water with 10 % extra cement (one part O.P.C. cement not to be less than 400Kg per Cum.) one & half parts coarse sand chopan (Khadan F.M.2.0 to 2.5) and three parts 20mm graded hard stone ballast including proper placing with special closed but bottom openable bucket or tremie Pipe in proper position after cleaning the cavity formed at the bottom of the well with cost of all materials, labour and T&P complete and testing the compaction and soundness of the concrete by dewatering the well after.(NSI) | 391 | Cum | 12,000 ₹46,92,000 | 4,500 ₹17,59,500 Lowest | 10,000 ₹39,10,000 | 8,698 ₹34,00,918 |
| 7.00 | Plain Cement concrete in top plug of the well with concrete mix 1:2:4 with one part O.P.C. cement not (not less than 300Kg per cum.meter), two part coarse sand (F.M. 1.5 to 2.0) and four part 2cm gauge approved hard stone ballast including supply of all materials labour, side shuttering if required and T&P etc. required for proper completion of the work (NSI) | 20 | Cum | 10,000 ₹2,00,000 | 7,000 ₹1,40,000 Lowest | 10,000 ₹2,00,000 | 8,010.24 ₹1,60,204.8 |
| 8.00 | Supplying, cutting, bending, moulding in the required shape, placing & binding with binding wire or welding where required, in all parts of the well foundation, as per approved drawing and specification, HYSD / TMT Fe 415 grade reinforcement bars of TATA/SAIL make including cost of all materials, labour, tools, tackels, plants & equipments etc, complete as required for successful completion of the work.(NSI) | 201 | MT | 80,000 ₹1,60,80,000 Lowest | 80,000 ₹1,60,80,000 Lowest | 80,000 ₹1,60,80,000 Lowest | 96,417 ₹1,93,79,817 |
| 9.00 | Sand filling in well as per drawing and technical specifications including supply of necessary quantity of local sand etc.(SOR Ch. 2.3d+10% C.P.) | 2,116 | Cum | 150 ₹3,17,400 | 90 ₹1,90,440 Lowest | 150 ₹3,17,400 | 422.4 ₹8,93,798.4 |
| 10.00 | Fixing template for fixing stub for tower erection including stub setting, level and alignment, stub shall be provided by department, free of cost. (NSI) | 1 | Job | 25,000 ₹25,000 Lowest | 1,00,000 ₹1,00,000 | 55,000 ₹55,000 | 1,84,607 ₹1,84,607 |
Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
16 Feb 2024, 2:00 pmClosed
SE CIVIL
57 GEORGE TOWN
WELL FOUNDATIO WORKS
2024_UPCTL_887100_1
57/ECTC,PRG/2023-24
Open Tender
Civil Works
Item Rate
150 days
VARANSI
REFER TO TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PNB A/c No. 8832005900000016 IFSC PUNB0883200
₹25.8 L
7 Mar 2024
31 Jan 2024
17 Feb 2024
31 Jan 2024
16 Feb 2024
31 Jan 2024
Amount
Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (CSI No. 4.01)
Add to Earth work item no. 01 (CSI No. 4.01) for every additional 30m lead or part thereof or for every additional 1.5M lift or part thereof. (CSI No. 4.04)
Providing and laying cutting edge of MS Angle iron & plates of SAIL/ TISCON for well foundation complete as per drawing and technical specifications including supply of all material, straightening, bending, welding, labour, tools and tackels plants & equipments with primer and painting etc complete as required for successful completion of the work. (NSI)
RCC work in well Curb with concrete mix 1:1:2 (one part O.P.C. cement (not less than 550Kg per Cum.) one part of coarse sand chopan (khadan F.M. 2.0 to 2.5) and two parts 20 mm graded hard stone ballast including shuttering and placing, fixing and binding of reinforcement bars with 24 BWG binding wire in proper position as per approved drawing including placing of concrete and compacting the same with vibrators with cost of all materials labour and T&P complete. This concrete must give strength equivalent or more than M-25 grade concrete. (NSI)
RCC work in Well steining and well cap with concrete mix 1:1.5:3 (One part O.P.C. cement not less than 400Kg per Cum.), one & half parts coarse sand Chopan (Khadan F.M. 2.0 to 2.5) and three parts 20 mm graded hard stone ballast including proper shuttering and placing, fixing and binding the reinforcement bars with 24 BWG binding wire in proper position as per approved drawing including placing of concrete and compacting the same with vibarators with cost of all materials,labour and T&P complete. This concrete must give strength equivalent or more than M-20 grade concrete. (NSI)
Plain CC work in bottom plug of the well with concrete mix 1:1.5:3 under water with 10 % extra cement (one part O.P.C. cement not to be less than 400Kg per Cum.) one & half parts coarse sand chopan (Khadan F.M.2.0 to 2.5) and three parts 20mm graded hard stone ballast including proper placing with special closed but bottom openable bucket or tremie Pipe in proper position after cleaning the cavity formed at the bottom of the well with cost of all materials, labour and T&P complete and testing the compaction and soundness of the concrete by dewatering the well after.(NSI)
Plain Cement concrete in top plug of the well with concrete mix 1:2:4 with one part O.P.C. cement not (not less than 300Kg per cum.meter), two part coarse sand (F.M. 1.5 to 2.0) and four part 2cm gauge approved hard stone ballast including supply of all materials labour, side shuttering if required and T&P etc. required for proper completion of the work (NSI)
Supplying, cutting, bending, moulding in the required shape, placing & binding with binding wire or welding where required, in all parts of the well foundation, as per approved drawing and specification, HYSD / TMT Fe 415 grade reinforcement bars of TATA/SAIL make including cost of all materials, labour, tools, tackels, plants & equipments etc, complete as required for successful completion of the work.(NSI)
Sand filling in well as per drawing and technical specifications including supply of necessary quantity of local sand etc.(SOR Ch. 2.3d+10% C.P.)
Fixing template for fixing stub for tower erection including stub setting, level and alignment, stub shall be provided by department, free of cost. (NSI)
Sinking of 7.0 M external diameter well through all kinds of strata such as sand, clay, silt in aluvial soil mixed small kanker (bajri) rock etc by dredging out the muck with suitable devices and loading the the well for further sinking where well is not sinking under itself weight, also engaging all limits to controls tilts and shift within the premissible limits (Max Tilt 1 in 80 and Max shift of 150 mm in resultant direction). Any change in actual tilt and shift may necessitate change in the design of well and cantilever etc and any extra cost on this account shall have to be borne by the contractor depth of sinking is to reckoned from the lowest water level.(NSI) (i) For 0.00 to 3.00 M depth.
(ii) For 3.00 to 10.00 M depth.
(iii) For 10.00 to 15.00 M depth.
(iv) For 15.00 to 20.00 M depth.
(v) For 20.00 to 25.00 M depth.
(vi) For 25.00 to 30.00 M depth.
(vii) For 30.00 to 35.00 M depth.
(viii) For 35.00 to 40.00 M depth.
(ix) For 40.00 to 45.00 M depth.
(x) For 45.00 to 50.00 M depth.
Providing and constructing 10M wide service road to reach locations indry area of river bed with sand bags and compacted earth including supply of all materials labour and T&P etc as required for proper completion of the work. (NSI)
Transportation of all T&P/Machinary required for boring & S.P.T test, spilt spoon sampler etc ,technician, labour upto the site/location of work in mid stream of Ghaghra river & back to laboratory along with special T & P such as diamand bit dril sampler for taking undisturbed & disturebed soil sample and rock samples recovered in daimond bit drilling process for testing in laboratory.(CSI 19.28)
Field investigation -making bore hole at each leg location of RC Tower of 132KV Ghazipur-Bhadaura S/C Transmission Line in all types of soil strata with MS casing pipe of outer 150mm dia or more as required as per site condition by any method suitable for site condition in accordance with I.S specification No./ 1982-1979 and 1498-1970 and conducting standard penetration test (S.P.T) in accordance with IS specification No./2131-1981 at every 3.0 metre approx or at change of strata during making bore hole and also collecting undisturbed and disturbed soil samples at every 3.0 metre depth or change of strata of soil as per site requirements in each bore hole in accordance with IS Specification No.1892-1978 (Depth of water table to be determined).Avarage depth of each bore hole shall be 50 M.(CSI No. 28.13)
Soil testing for design & construction of well foundation at each leg location of 220 KV RC Tower of 132 KV Ghazipur-Bhadaura S/C Transmission Line in accordance with corresponding IS codes. Collection of Disturbed & Undistrubed samples, SPT at every 3.0 m interval by boring a bore hole of depth of 50 m in all type of soil strata as per below specification & Test. CSI No. 28.14 (i)Consolidation Test as per ISS-2720( Part xv )on clay soil (ii) Sieve analysis test as per ISS 2720 (Part iv) (iii) Atterberg’s limit tests as per ISS –2720 (Part v) (iv) Particle size analysis test as per ISS 2720 (Part iv) (v) Natural moisture content test as per ISS 2720 (Part vi) (vi) Wet density test and dry density test as per ISS 2720 (Part vi) (vii) Specific gravity test as per ISS 2720 (Part iii) section 2 Disturbed soil samples will be prepared in accordance with ISS 2720 (Part I) 1983 and tested as follows (i) Sieve analysis test as per ISS – 2720 (part iv) (ii) Atterberg's limit test as per ISS – 2720 (part v) Submission of soil test report in accordance with the latest IS Code and it must include all the parameters required for designing of well foundation in 03 sets of copies. (CSI 28.14)
Providing design and drawing of well foundation required for construction of well foundation for 01no 220 KV RC Tower on Ganga River of 132KV Ghazipur-Bhadaura S/C Transmission Line in accordance with soil test reoprt provided by the firm & Vetting of drawing from Indian Institute of Technology. (I.I.T.)(Complete design and Drawing in 03 sets of copies is to be provided.
AMIT CONSTRUCTION Co.
M/S MITTAL BROTHERS ENGINEERS AND
M/S Krishna Associate
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.21 MB
57DocsWellFoundatuonGhazipurVNS.pdf
Tender Documents • 1.77 MB
BOQ_1520804.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .