Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.8 L+₹71,352.25 (7.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹10.5 L+₹1.4 L (15.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹13.0 L+₹3.9 L (43.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹13.5 L+₹4.5 L (49.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.7 L
EMD Value
₹29,300
Closing Date
3 Aug 2026, 4:00 pmClosed
Executive Engineer RNB Division Pulwama
Executive Engineer RNB Division Pulwama
Construction of R wall on Newa Rahmoo road..
2026_PWDJK_316925_1
72/EEP/RNB/of 2026-2027/3794-3804 Dt.20.07.2026
Open Tender
Civil Works
Percentage
30 days
Pulwama
as per nit
3 documents required · 3 mandatory
₹600
Bearing No 0470010200000099
₹29,300
6 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil : | - | cum | - | - |
| 2 | Dry Random Rubble masonary with hard stones(quarry) in foundations & plinth above ground in wire creates of 4 mm dia Black anealed wire conforming to IS :280& IS:4826 in 100 mm x100 mm mesh { Woven diagonally incl 10% extra for laps& joints including cost carriage knitting,tipping etc all complete job | - | cum | - | - |
| 3 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification RBM(Granular material), including cost and carriage of material from approved source to site of work with all leads, lifts, loadinging,unloading and octroi(Finished work to be measured) | - | cum | - | - |
| 4 | engagement of jcb for site clearance,surface dressing,cutting trees,vegetation removal,demolishinf damaged cement concrete work and other unforseen items etc | - | hr | - | - |
| 5 | Providing & laying of RCC spun pipes i/c necessary earthwork in excavation and filling cushion over pipes i/c cost and carriage of all materials complete. 36" dia | - | rft | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1036203.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .