| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.0 LAccepted-Finance | ₹53.0 L | L1 | Accepted-Finance Amount reduced after voluntary reduction. The revised rate is 4.97 percentage above the department base rate. Falls under L1 category. Hence accepted |
| 2 | L2₹59.9 L+₹6.9 L (13.1%)Rejected-Finance | ₹59.9 L+₹6.9 L (13.1%) | L2 | Rejected-Finance Higher rate. Amount quoted 18.70 percentage above the department base rate. Falls under L2 category. Hence rejected |
| Sl No | Description | Qty | Unit | KALAVI CONTRACTOR L2 | BHARATH ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Name of works:- Attending steel repair works of 75 MT steel Dumb Barge (DB 75 Minicoy) belongs to Port Department Agatti
Item No.1 Beaching the 75 Ton capacity steel dumb barge from anchorage to beaching yard area, securing the barge in position, leveling the beaching yard, conveying and laying wooden sleeper 30 x 20 cm x 4 mtr long at regularar intervel from low water line up to 50 mtrs from high water line, providing steel roller 20 cm dia and 6 mtrs long underneeth the barge, positioning, securing, providing shore anchor, wire rope & pulleys in the barge, beaching the barge with the help to DD winch beyond high water lines as directed by EIC, hauling up the barge up to a hight of 1 mtrs with the help of hudraulic jack, wooden blocks, so as to under take steel repair works etc., including cost of all labour charge minor tools, transportation of materials to work site, leveling beaching yard etc., but excluding, cost of wooden sleepers, steel rollers, DD winch with accessories without operator which will be issued on free of cost by the department etc., complete. | 1 | Job | 1,50,000 ₹1,50,000 | 32,000 ₹32,000 Lowest |
| 2.00 | Item No.2 Cutting, removing damaged portion of deck plate, towing post etc., of 75 MT dumb barge belongs to Port department by gas cutting and maing the structure surface perfrectly in level to facilitate to fabrication of new steel items without deviating the original alignment, stacking the cut and removed steel materials within the lead of 50 mtr as directed by EIC, including cost of all labour charges, cost of minor tools, cost of all materials required, transportation charges of all materials to work site etc., complete. | 267 | Sqm | 800 ₹2,13,600 | 600 ₹1,60,200 Lowest |
| 3.00 | Item No.3 Fabrication, errection and assembling of steel structural by cutting / removing as well as by addition to the structure to strengthen existing structures with various size of MS plates, Angles and other steel structures by using are welding with 4.00 mm / 3.15 mm advani orelikon over coated electrodes and gas welding as per the direction of EIC, including running expences of welding gen set, cost of all labour charges, minor tools, cost of electrods, gas cylinders, transprotation charges of all materials to work site, cost of steel structurals such as LLYODS GRADE-A/SAIL/RINL/TATA/TISCO Steel Plates, angles, seamless pipes, flats of various sizes etc, complete. | 18.25 | MT | 2,00,000 ₹36,50,000 | 1,95,000 ₹35,58,750 Lowest |
| 4.00 | Item No.4 Chipping, Scrapping and thoroughly cleaning the old steel surface with chipping hammer, scrapper etc., and cleaning with wire brush and cotton waste etc., as directed by the Engineer-In-Charge including cost of all labour charge, cost of chipping hammer, scraper, cotton waste, minor tools etc., complete. | 908 | Sqm | 300 ₹2,72,400 | 275 ₹2,49,700 Lowest |
| 5.00 | Item No.5 Painting the cleaned surface of the craft with one coat of approved marine quality primer paint / marine quality epoxy primer and painting two coats of marine quality enamel colour paints over the primer coat as directed by the Engineer in charge including cost of all labour charge, cost of primer paint, enamel paint, thinner, painting brush, minor tools etc., complete. | 1,466 | Sqm | 650 ₹9,52,900 | 620 ₹9,08,920 Lowest |
| 6.00 | Item No.6 Supply and fixing of anodes of Zinc Alloy (IS code 8062 (Part-IV) -1979) of size 3.5' x 1.5' x 12' with four legs in a zigzag manner over the outer submerged surface below water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of Sacrificing Zinc Anode size 3.5' x 1.5' x 12', transportation charges of materials etc., complete. | 16 | Nos | 10,000 ₹1,60,000 | 9,000 ₹1,44,000 Lowest |
| 7.00 | Item No.7 Supply & Fixing of suitable all old truck tyres as fenders in the sides of barge with G.I Chain & D-shackles etc. just above water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of tyre fenders, transportation charges of materials etc., complete | 25 | Nos | 8,000 ₹2,00,000 | 5,500 ₹1,37,500 Lowest |
| 8.00 | Item No.8 Launching of the Dump Barge from the existing beached position to sea at Agatti, floating & berthing safely along the jetty/safe anchorage without any damage as directed by the Engineer in Charge including cost of all labour charges, minor tools, pullies, 'D' shackles etc; But excluding hire charges of winch with sleepers, rollers, which will be supplied by the department on free of cost etc; complete. | 1 | Job | 1,30,000 ₹1,30,000 | 1,00,000 ₹1,00,000 Lowest |
| 9.00 | Name of work :- Chipping, Scrapping and painting of 25 MT dump barge belongs to Port department at Agatti.
Item No.1 Chipping, Scrapping and throughly cleaning the steel surface of the 25MT Dumb Barge at Agatti with chipping hammer, scrapper etc. and cleaning with wire brush and cotton waste etc. and painting with one coat of marine quality epoxy metal primer and two coats of marine quality antifouling bitumen based colour paints over the surface of steel crafts as directed by EIC, including cost of all labour charges, cost of paint, thinner and all other materials and tools required etc., complete. | 124 | Job | 800 ₹99,200 | 700 ₹86,800 Lowest |
| 10.00 | Item No.2 Supply & Fixing of suitable all old truck tyres as fenders in the sides of barge with G.I Chain & D-shackles etc. just above water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of tyre fenders, transportation charges of materials etc., complete | 20 | Each | 8,000 ₹1,60,000 | 5,500 ₹1,10,000 Lowest |
Tender Value
₹50.4 L
EMD Value
₹1.0 L
Closing Date
14 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (CIVIL), ALHW, KAVARATTI
O/O THE DEPUTY CHEIF ENGINEER ALHW, KAVARATTI ISLAND, UT OF LAKSHADWEEP
ATTENDING STEEL REPAIRS TO 75 MT DUMP BARGE AND SCRAPPING AND PAINTING OF 25 MT DUMP BARGE BELONGS TO PORT DEPARTMENT AT AGATTI
2026_ALHW_906476_1
No.DCE/KVT/DB/T-06/2026-27/975 Dated. 23.04.2026
Open Tender
Metal Fabrication
Item Rate
120 days
AGATTI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.0 L
30 Jun 2026
24 Apr 2026
15 May 2026
24 Apr 2026
14 May 2026
24 Apr 2026
24 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of works:- Attending steel repair works of 75 MT steel Dumb Barge (DB 75 Minicoy) belongs to Port Department Agatti
Item No.1 Beaching the 75 Ton capacity steel dumb barge from anchorage to beaching yard area, securing the barge in position, leveling the beaching yard, conveying and laying wooden sleeper 30 x 20 cm x 4 mtr long at regularar intervel from low water line up to 50 mtrs from high water line, providing steel roller 20 cm dia and 6 mtrs long underneeth the barge, positioning, securing, providing shore anchor, wire rope & pulleys in the barge, beaching the barge with the help to DD winch beyond high water lines as directed by EIC, hauling up the barge up to a hight of 1 mtrs with the help of hudraulic jack, wooden blocks, so as to under take steel repair works etc., including cost of all labour charge minor tools, transportation of materials to work site, leveling beaching yard etc., but excluding, cost of wooden sleepers, steel rollers, DD winch with accessories without operator which will be issued on free of cost by the department etc., complete. | - | Job | - | - |
| 2 | Item No.2 Cutting, removing damaged portion of deck plate, towing post etc., of 75 MT dumb barge belongs to Port department by gas cutting and maing the structure surface perfrectly in level to facilitate to fabrication of new steel items without deviating the original alignment, stacking the cut and removed steel materials within the lead of 50 mtr as directed by EIC, including cost of all labour charges, cost of minor tools, cost of all materials required, transportation charges of all materials to work site etc., complete. | - | Sqm | - | - |
| 3 | Item No.3 Fabrication, errection and assembling of steel structural by cutting / removing as well as by addition to the structure to strengthen existing structures with various size of MS plates, Angles and other steel structures by using are welding with 4.00 mm / 3.15 mm advani orelikon over coated electrodes and gas welding as per the direction of EIC, including running expences of welding gen set, cost of all labour charges, minor tools, cost of electrods, gas cylinders, transprotation charges of all materials to work site, cost of steel structurals such as LLYODS GRADE-A/SAIL/RINL/TATA/TISCO Steel Plates, angles, seamless pipes, flats of various sizes etc, complete. | - | MT | - | - |
| 4 | Item No.4 Chipping, Scrapping and thoroughly cleaning the old steel surface with chipping hammer, scrapper etc., and cleaning with wire brush and cotton waste etc., as directed by the Engineer-In-Charge including cost of all labour charge, cost of chipping hammer, scraper, cotton waste, minor tools etc., complete. | - | Sqm | - | - |
| 5 | Item No.5 Painting the cleaned surface of the craft with one coat of approved marine quality primer paint / marine quality epoxy primer and painting two coats of marine quality enamel colour paints over the primer coat as directed by the Engineer in charge including cost of all labour charge, cost of primer paint, enamel paint, thinner, painting brush, minor tools etc., complete. | - | Sqm | - | - |
| 6 | Item No.6 Supply and fixing of anodes of Zinc Alloy (IS code 8062 (Part-IV) -1979) of size 3.5' x 1.5' x 12' with four legs in a zigzag manner over the outer submerged surface below water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of Sacrificing Zinc Anode size 3.5' x 1.5' x 12', transportation charges of materials etc., complete. | - | Nos | - | - |
| 7 | Item No.7 Supply & Fixing of suitable all old truck tyres as fenders in the sides of barge with G.I Chain & D-shackles etc. just above water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of tyre fenders, transportation charges of materials etc., complete | - | Nos | - | - |
| 8 | Item No.8 Launching of the Dump Barge from the existing beached position to sea at Agatti, floating & berthing safely along the jetty/safe anchorage without any damage as directed by the Engineer in Charge including cost of all labour charges, minor tools, pullies, 'D' shackles etc; But excluding hire charges of winch with sleepers, rollers, which will be supplied by the department on free of cost etc; complete. | - | Job | - | - |
| 9 | Name of work :- Chipping, Scrapping and painting of 25 MT dump barge belongs to Port department at Agatti.
Item No.1 Chipping, Scrapping and throughly cleaning the steel surface of the 25MT Dumb Barge at Agatti with chipping hammer, scrapper etc. and cleaning with wire brush and cotton waste etc. and painting with one coat of marine quality epoxy metal primer and two coats of marine quality antifouling bitumen based colour paints over the surface of steel crafts as directed by EIC, including cost of all labour charges, cost of paint, thinner and all other materials and tools required etc., complete. | - | Job | - | - |
| 10 | Item No.2 Supply & Fixing of suitable all old truck tyres as fenders in the sides of barge with G.I Chain & D-shackles etc. just above water level of Pontoon as directed by Engineer In Charge including cost of all labour charges, minor tools, cost of tyre fenders, transportation charges of materials etc., complete | - | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.51 MB
bidT06.pdf
Tender Documents • 1.42 MB
BOQ_952790.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .