Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.8 LAccepted-AOC GHARCHE | ₹58.8 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹60.0 L+₹1.2 L (2.07%)Rejected-AOC PATIALA GATE SANGRUR | SANGRUR | SANGRUR | PUNJAB | 148001 | ₹60.0 L+₹1.2 L (2.07%) | L2 | Rejected-AOC Not Lowest bidder |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
11 Mar 2026, 1:00 pmClosed
Executive Engineer
Executive Engineer Const Divn PWD B and R, near old sabji Mandi Barnala
Construction of C.V.H. at Dhanaula District Barnala
2026_CEPW_162396_1
Bid no. 35 Dated 18.02.2026 ( Construction of C.V.H. at Dhanaula Distt. Barnala)
Open Tender
Civil Works - Buildings
Percentage
120 days
Dhanaula
Please Refer Tender Document
10 documents required · 10 mandatory
₹5,000
₹1.3 L
Yes
20 Apr 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| 2 | CONSTRUCTION OF MAIN BUILDING (CVH) | - | - | - | - |
| 3 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | cum | 191.74 | - |
| 4 | Cement Concrete 1:4:8 with stone ballast of size. 40 mm guage. using concrete mixing volumetric type | - | cum | 4,548.61 | - |
| 5 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | - | cum | 6,393.85 | - |
| 6 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | - | sqm | 221.24 | - |
| 7 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | - | cum | 6,141.19 | - |
| 8 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | - | cum | 7,183.97 | - |
| 9 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. | - | sqm | 400.33 | - |
| 10 | Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 1 | sqm | 560.46 | ₹559.9 |
stage.html
html • 0.04 MB
technical_329055.pdf
techsummary_329055.pdf
finance_329055.pdf
BOQ Comparative Chart
xlsx
finsummary_329055.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
SBD.pdf
Tender Documents • 25.94 MB
Cond.pdf
Additional Documents • 20.00 MB
BOQ_329055.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .