| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.8 L+₹2.5 L (8.22%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹34.1 L+₹3.8 L (12.6%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | KOGANTI CONSTRUCTION COMPANY L2 | NEWS CONSTRUCTIONS L3 | VACON INFRASTRUCTURES L1 |
|---|---|---|---|---|---|---|
| 1.00Note: 1. Contractor need to purchase minimum 50% of all items mentioned in this CA within 20 days of getting sample approval and kept in custody so that no delay in work due to non-availability of materials will be faced. Contractor should ensure during the cause of work that he has minimum 25% of materials with him till the completion of item/date. 2. Contractor should buy the exact items which are given with catalogue reference. Other makes will be approved only by submitting non availability Certificate Company. Contractor need to remove all the dismantled items without delay. 3. Rate quoted for demolition/dismantling /taking down is inclusive of removing the same from site and dumping at given locations anywhere inside station. 4. If any painting works, contractor need to clean the area and remove the drop marks from floor, doors, windows, sills, inbuilt furniture items etc. otherwise a recovery of Rs 10.00 per sqm in internal paintings and Rs 5.00 per sqm for external paintings will be made from contractor. 5. Contractor should maintain separate registers for plumbing and carpenter repair works. Day to day complains should be noted in those registers with SI nos of complaints, location, qty of work, status of complaints and signature of incharge and stamp of the office. Format will be given from AGE B/R Office. Contractor should obtain the signature of incharge on the same day of work. These registers to be submitted to JE (Civ) on every weekend without fail. 6. List of complaints will be given to contractor on the first week of every month. Contractor should ensure all the works will be completed within that month itself. 7. Contractor should ensure that plumbing complaints resulting in wastage of water should be attended and rectified within 24 hours. Otherwise, a recovery of 25% of corresponding item will be made from contractor. 8. Contractor will make his own arrangement to store his items. 9. Some places in this contract where the vehicle will not reach the spot directly, the material will be moved manually in these places. The rate quoted will be considered all inclusive on this account. 10. All trade skilled labour required in this contract shall be present daily in working hours, irrespective of complaints received. 11. Complaint for a similar items may be in scattered / different area, quoted rate will be considered all inclusive on this account. | ||||||
| 1.01 | Dismantiling of mild steel work of any description not other wise provided for completed all as directed. | 5 | Qtl | 350 ₹1,750 | 300 ₹1,500 | 200 ₹1,000 Lowest |
| 2.00 | S&F angle/ flate iron/chanel framed work such as iron gate, ladder, grills, gratings,framed guard bars, etc., with ends of bars shouldered and/ or riveted, or forged into spikes, and similar work confirming to Fe 290 Gde E-165 | 500 | Kg | 95 ₹47,500 Lowest | 100 ₹50,000 | 105 ₹52,500 |
| 3.00 | Demolition of Reinforced cement concrete of any description and in any position not otherwise specifically provided for | 4 | Cum | 710 ₹2,840 | 600 ₹2,400 | 100 ₹400 Lowest |
| 4.00 | M& L for Providing precast cement concrete in landings, cover slabs (for Drain etc.) chullah hoods, chajjas, water troughs, mangers, shelves and similar articles with plain faces and setting in mortar complete with joints to match with Type B1 1:2:4 (20mm graded aggregate) | 4 | Cum | 7,500 ₹30,000 | 5,500 ₹22,000 Lowest | 8,000 ₹32,000 |
| 5.00 | M&L TMT steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips quality conforming to | 400 | Kg | 80 ₹32,000 Lowest | 95 ₹38,000 | 90 ₹36,000 |
| 6.00 | Demolition of cement concrete (unreinforced) of any description and in any position and disposed off to a distance exc. 500 mtrs and not exc.1.50 km all as directed by EIC. | 48.5 | Cum | 350 ₹16,975 | 250 ₹12,125 | 200 ₹9,700 Lowest |
| 7.00 | M & L for Plain Cement Concrete Type D2 1:4:8 (using 40 mm graded granite stone aggregate) in foundations, filling mass concrete and retaining wall etc complete all as specified & directed. | 8 | Cum | 2,900 ₹23,200 | 2,850 ₹22,800 Lowest | 4,000 ₹32,000 |
| 8.00 | Demolition of brick or stone/ boulder built in cement mortar complete all as specified. | 68 | Cum | 250 ₹17,000 | 250 ₹17,000 | 200 ₹13,600 Lowest |
| 9.00 | M & L for Pre-cast cement concrete block masonry with solid blocks, Type C1 1:3:6 (20mm graded aggregate) exc. 10 cm in width and setting in cement mortar 1:4, complete | 60 | Cum | 4,900 ₹2,94,000 Lowest | 5,500 ₹3,30,000 | 6,000 ₹3,60,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
7 Oct 2025, 6:00 pmClosed
GE (AF) Hakimpet
Secunderabad
REPAIR TO PATH, KERBS, PAINTING, STORM WATER DRAIN, CULVERT, HARD STANDING BOUNDARY/ SECURITY WALL, FENCING, BARBED WIRE, CONCERTINA COIL AT BEGUMPET UNDER GE (AF) HAKIMPET
2025_MES_729969_1
8832/E8
Open Tender
Civil Works
Item Rate
270 days
Begumpe
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Hakimpet
₹80,000
Yes
15 Nov 2025
9 Sept 2025
9 Oct 2025
9 Sept 2025
7 Oct 2025
23 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .