| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAdmitted-Finance | ₹43.5 L | L1 | Admitted-Finance |
| 2 | L2₹44.6 L+₹1.2 L (2.65%)Admitted-Finance R M OF PATH FROM AMBEDKAR ROAD NEAR SATISH SHOP TO PRATAP CHAUHAN NIWAS WARD NO 21 RD 0 00 TO 0 240 | ₹44.6 L+₹1.2 L (2.65%) | L2 | Admitted-Finance |
| 3 | L3₹50.3 L+₹6.8 L (15.7%)Admitted-Finance | ₹50.3 L+₹6.8 L (15.7%) | L3 | Admitted-Finance |
| 4 | L4₹51.3 L+₹7.8 L (18.0%)Admitted-Finance | ₹51.3 L+₹7.8 L (18.0%) | L4 | Admitted-Finance |
| 5 | L5₹53.3 L+₹9.9 L (22.7%)Admitted-Finance | ₹53.3 L+₹9.9 L (22.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARMANJOT SINGH L3 | Bilal Ahmed L5 | SUNIL SHARMA L4 | BALDEV SHARMA L2 | Swaran Bhogal L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 116.68 | P.Cum | 800 ₹93,344 | 900 ₹1,05,012 | 800 ₹93,344 | 800 ₹93,344 | 400 ₹46,672 Lowest |
| 2.00 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 54.56 | P.sqm | 500 ₹27,280 | 600 ₹32,736 | 520 ₹28,371.2 | 400 ₹21,824 | 350 ₹19,096 Lowest |
| 2.10 | Columns, Pillars, Piers, Abutments, Posts and Struts including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 56 | P.sqm | 550 ₹30,800 | 600 ₹33,600 | 560 ₹31,360 | 400 ₹22,400 | 250 ₹14,000 Lowest |
| 2.20 | Lintels,beams,plinth,beams,girders,bressumers and cantilevers. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 78.24 | P.sqm | 550 ₹43,032 | 600 ₹46,944 | 560 ₹43,814.4 | 400 ₹31,296 | 300 ₹23,472 Lowest |
| 2.30 | Suspended floor, roofs, landings, balconies and access platform including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 53.94 | P.Sqm | 550 ₹29,667 | 600 ₹32,364 | 560 ₹30,206.4 | 400 ₹21,576 | 300 ₹16,182 Lowest |
| 2.40 | Stairs, (excluding landings) except spiral-staircases including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 16.71 | P.Sqm | 500 ₹8,355 | 450 ₹7,519.5 | 560 ₹9,357.6 | 400 ₹6,684 | 350 ₹5,848.5 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 6.07 | P.Cum | 5,000 ₹30,350 | 5,200 ₹31,564 | 5,100 ₹30,957 | 400 ₹2,428 Lowest | 4,800 ₹29,136 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 31.67 | P.cum | 4,600 ₹1,45,682 Lowest | 5,000 ₹1,58,350 | 4,800 ₹1,52,016 | 5,000 ₹1,58,350 | 4,600 ₹1,45,682 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 5.72 | P.Cum | 6,500 ₹37,180 | 6,300 ₹36,036 | 6,500 ₹37,180 | 4,000 ₹22,880 Lowest | 6,500 ₹37,180 |
| 6.00 | R.C.C WORK: Providing and laying in position specified grade of reinforced cement concrete M 25 design mix , excluding the cost of centering, shuttering, finishing and reinforcement :- (i) All work up to plinth level including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 24.63 | P.Cum | 6,800 ₹1,67,484 | 7,000 ₹1,72,410 | 6,800 ₹1,67,484 | 5,000 ₹1,23,150 Lowest | 6,700 ₹1,65,021 |
Tender Value
₹51.1 L
EMD Value
₹1.0 L
Closing Date
24 Jun 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Construction of Multistoreyed Commercial Complex at Old Barrier Tutikandi ward No 10
2026_MC_136648_1
2166dated06062026
Open Tender
Civil Works
Item Rate
180 days
MC Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹2,360
Executive Engineer RB MC Shimla
₹1.0 L
9 Jul 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 116.68 | P.Cum | 100 | ₹11,668 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 54.56 | P.sqm | 101 | ₹5,510.56 |
| 2.1 | Columns, Pillars, Piers, Abutments, Posts and Struts including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 56 | P.sqm | 102 | ₹5,712 |
| 2.2 | Lintels,beams,plinth,beams,girders,bressumers and cantilevers. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 78.24 | P.sqm | 103 | ₹8,058.72 |
| 2.3 | Suspended floor, roofs, landings, balconies and access platform including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 53.94 | P.Sqm | 104 | ₹5,609.76 |
| 2.4 | Stairs, (excluding landings) except spiral-staircases including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 16.71 | P.Sqm | 105 | ₹1,754.55 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 6.07 | P.Cum | 106 | ₹643.42 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 31.67 | P.cum | 107 | ₹3,388.69 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 5.72 | P.Cum | 108 | ₹617.76 |
| 6 | R.C.C WORK: Providing and laying in position specified grade of reinforced cement concrete M 25 design mix , excluding the cost of centering, shuttering, finishing and reinforcement :- (i) All work up to plinth level including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 24.63 | P.Cum | 109 | ₹2,684.67 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 4.32 MB
Tendernotice_3.pdf
PDF • 0.70 MB
Tendernotice_4.pdf
PDF • 0.35 MB
BOQ_202273.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .