Executive Engineer
Paryatan Bhavan pato Panaji Goa
Beautification and Illumination Surrounding of Shree Somnath Balbhim Temple at Kirlapal Dabal Dharbandora Goa
2026_GTDCL_30106_1
GTDC/PC/EE(S)/2026-27/e-35
Open Tender
Civil Works
270 days
Paryatan Bhavan pato Panaji Goa
Please refer Tender documents.
9 documents required · 9 mandatory
₹8,000
₹3.2 L
4 Jul 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
16 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1CIVIL WORKS | ||||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 20 | 100 Sq.m | - | - | 18% |
| 1.02 | Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: Hard soil | 135 | Sq.m | - | - | 18% |
| 1.03 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All types of Ordinary rock including all types of laterite rock, blasting prohibited | 779 | Cu.m | - | - | 18% |
| 1.04 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.
All types of Ordinary rock including all types of laterite rock, blasting prohibited | 374 | Cu.m | - | - | 18% |
| 1.05 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 88 | Cu.m | - | - | 18% |
| 1.06 | Disposal of unserviceable material such as buiding rubbish,wood,earth excavated rock etc for all leads and lifts beyond 50m, Upto 5km | 1,200 | Cu.m | - | - | 18% |
| 1.07 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 244 | Cu.m | - | - | 18% |
| 1.08 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 71 | Cu.m | - | - | 18% |
| 1.09 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 37 | Cu.m | - | - | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 0.36 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.66 MB
Tendernotice_5.pdf
PDF • 1.43 MB
Tendernotice_6.pdf
PDF • 0.30 MB
BOQ_30524.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid