| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹12.0 CrAccepted-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹12.0 Cr | l1 | Accepted-AOC l1 |
| 2 | l2₹12.3 CrRejected-Finance | ₹12.3 Cr | l2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ENTERPRISES L1 | YADAV AND SONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in making diversion from ordinary soil by any means Including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge . | 20,154.04 | m3 | 70 ₹14,10,782.8 Lowest | 90 ₹18,13,863.6 |
| 2.00 | Earth work in Strengthening of bank from ordinary soil by any means Including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge . | 48,123.6 | m3 | 65 ₹31,28,034 Lowest | 75 ₹36,09,270 |
| 3.00 | Dismantalling of brick work in cement mortar including stacking of dismantled materials as directed by engineer-in- charge within a distance of 60M. | 2,648.64 | m3 | 500 ₹13,24,318.25 Lowest | 500 ₹13,24,318.25 Lowest |
| 4.00 | Dry Earth work in foundation of masonry work on channels of discharge below 10 cumecs , Including all lead & lift including disposal and back filling with all cost of labour and T & P etc. | 15,540.73 | m3 | 100 ₹15,54,072.67 Lowest | 100 ₹15,54,072.67 Lowest |
| 5.00 | Providing and laying of cement concrete 1 : 3 : 6 ( 1 cement : 3 Coarse sand : 6 stone grit 20-40 mm nominal size ) in foundation , Including supply of all materials , labour , tools & plants etc. required for proper completion of work. | 1,268.18 | m3 | 8,300 ₹1,05,25,874.5 Lowest | 8,500 ₹1,07,79,510.03 |
| 6.00 | Centering & shutering for R.C.C. work including all cost of material , labour and T & P etc. required for porper completion of the work . | 7,494.11 | sqm | 900 ₹67,44,702.6 Lowest | 950 ₹71,19,408.3 |
| 7.00 | Steel Bending , Binding , Cutting and Placing in proper position , Including all cost of labour and material T & P etc. required for porper completion of the work . | 222.43 | MT | 79,190 ₹1,76,14,247.54 | 79,000 ₹1,75,71,985.8 Lowest |
| 8.00 | Laying CC of concrete grade 1:1.5:3 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. | 847.29 | m3 | 10,000 ₹84,72,890 Lowest | 10,000 ₹84,72,890 Lowest |
| 9.00 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , including the cost of material, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.
(proportion as per design mix) | 3,931.92 | m3 | 12,000 ₹4,71,83,011.2 Lowest | 12,300 ₹4,83,62,586.48 |
| 10.00 | Dewatering by 5HP deisel pump including suction and delievery pipe, operator, Khalasi and POL complete with all respect | 1,920 | Hours | 200 ₹3,84,000 Lowest | 200 ₹3,84,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹25.9 L
Closing Date
19 May 2026, 11:00 amClosed
SUPERINTENDING ENGINEER
O/O SE XITH CIRCLE IW AYODHYA
AS PER NIT01 LOT02
2026_UPIDC_1147738_2
01/SE-XI/2026-27
Open Tender
Civil Works
Item Rate
270 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
₹25.9 L
O/O SE XITH CIRCLE IW AYODHYA
20 Aug 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in making diversion from ordinary soil by any means Including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge . | 20,154.04 | m3 | - | - |
| 2 | Earth work in Strengthening of bank from ordinary soil by any means Including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge . | 48,123.6 | m3 | - | - |
| 3 | Dismantalling of brick work in cement mortar including stacking of dismantled materials as directed by engineer-in- charge within a distance of 60M. | 2,648.64 | m3 | - | - |
| 4 | Dry Earth work in foundation of masonry work on channels of discharge below 10 cumecs , Including all lead & lift including disposal and back filling with all cost of labour and T & P etc. | 15,540.73 | m3 | - | - |
| 5 | Providing and laying of cement concrete 1 : 3 : 6 ( 1 cement : 3 Coarse sand : 6 stone grit 20-40 mm nominal size ) in foundation , Including supply of all materials , labour , tools & plants etc. required for proper completion of work. | 1,268.18 | m3 | - | - |
| 6 | Centering & shutering for R.C.C. work including all cost of material , labour and T & P etc. required for porper completion of the work . | 7,494.11 | sqm | - | - |
| 7 | Steel Bending , Binding , Cutting and Placing in proper position , Including all cost of labour and material T & P etc. required for porper completion of the work . | 222.43 | MT | - | - |
| 8 | Laying CC of concrete grade 1:1.5:3 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. | 847.29 | m3 | - | - |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , including the cost of material, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.
(proportion as per design mix) | 3,931.92 | m3 | - | - |
| 10 | Dewatering by 5HP deisel pump including suction and delievery pipe, operator, Khalasi and POL complete with all respect | 1,920 | Hours | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
NIT01LOT02DOCUMENT.pdf
Tender Documents • 3.33 MB
BOQ_2147773.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].