Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.3 CrAdmitted-Finance 0 JAGDISHPUR SOHOULI MARTINGANJ TEH MARTINGANJ AZAMGARH UTTAR PRADESH 276301 | AZAMGARH | UTTAR PRADESH | 276301 | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 3 | L1₹1.3 CrAdmitted-Finance B 304 RAJAJIPURAM AMBA PALACE AWAS VIKAS COLONY LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 4 | L1₹1.3 CrAdmitted-Finance | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 5 | L1₹1.3 CrAdmitted-Finance | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹9.6 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Road and drain construction work from the house of Ram Narayan Singh in Kaushalpuri Colony under Khargapur Saraswan Ward to the house of HN Singh and Ambika Nath Singh via the park.
2026_DOLBU_1152704_1
33/CE/2026-27/04
Open Tender
Civil Works
Fixed-rate
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,039
Lucknow Municipal Corporation
₹9.6 L
23 Jun 2026
23 May 2026
5 Jun 2026
23 May 2026
5 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing RCC work manually by mechanical means incl stacking of steel bars and disposal of unservicable material within 50 meter etc alll comp | 13.44 | Cum | 2,805.31 | ₹37,703.37 |
| 2 | excavating supplying stacking and filling of local earth incl royalty by etc alll comp | 1,837.5 | Cum | 553.36 | ₹10,16,799 |
| 3 | P/L leam concrete in 1:5:10 cement coarse sand etc all comp | 73.92 | Cum | 4,889.51 | ₹3,61,432.58 |
| 4 | Providing and laying in position grade of rainforced cement concrete excluding the cost of centering and shuttering finishing and rainfocement all work upto plinth level 1:1.5:3 derived from natural sources20mm nominal etc all comp | 344.52 | Cum | 7,145.71 | ₹24,61,840.01 |
| 5 | Centering and shuttering incl structing propping and removal etc alll comp wall | 1,386 | Sqm | 665.53 | ₹9,22,424.58 |
| 6 | Centering and shuttering incl structing propping and removal etc alll comp slab | 462 | Sqm | 732.48 | ₹3,38,405.76 |
| 7 | S/L of GSB with grader incl its consolidation etc alll comp | 595.8 | Cum | 3,866.86 | ₹23,03,875.19 |
| 8 | S/I polythene sheet of appd thickness etc alll comp | 3,972 | Sqm | 15 | ₹59,580 |
| 9 | Providing and laying CC pavemant mix M-25 with ready mixed concrete from batching plant the rady mixed concrete shall be laid and finished etc alll comp | 595.8 | Cum | 7,760.31 | ₹46,23,592.7 |
| 10 | Providing and applying hardner etc alll comp | 4,965 | Kg | 24 | ₹1,19,160 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_2159396.xls
BOQ • 0.29 MB
RFPSignTwobd.pdf
Tender Documents • 6.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .