Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12,737.52Accepted-Finance 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 | BHOPAL | MADHYA PRADESH | 462001 | ₹12,737.52 | L1 | Accepted-Finance L1 |
| 2 | L2₹18,552.58Accepted-Finance 12 27 SEVIGOUNDAR NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹18,552.58 | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | R K ELECTRICALS L1 | M/S. PAVISH ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for Rewinding of one number 5.5 KW,3 phase,415V,NGEF make- Online Condenser Tube cleaning system (OLCTCS) motor including dismantling, cleaning, winding of the stator coils, applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling. | 1 | No | 7,164 ₹7,164 Lowest | 9,743 ₹9,743 |
| 2.00 | Charges for metal filling, machining and repairing of worn out shafts / bearing seating surfaces on DE and NDE sides, checking of bearing housings, providing sleeves in the end covers of one side of OLCTCS (if necessary) | 2 | Nos | 609 ₹1,218 Lowest | 828 ₹1,656 |
| 3.00 | Charges for Painting with 2 coats of OLCTCS motor 1 No. | 0.38 | sqmm | 104 ₹39.52 Lowest | 141 ₹53.58 |
| 4.00 | Bearing 6308 2Z/C3 (SKF make) for Sl.No:621 054 79, OLCTC Motor - DE/NDE | 2 | Nos | 12 ₹24 Lowest | 16 ₹32 |
| 5.00 | Charges for standard make super enamelled copper wire (F class). | 8 | Kg | 820 ₹6,560 Lowest | 1,115 ₹8,920 |
| 6.00 | End Sleeves for DE/NDE covers for 5.5 KW motor.(if necessary) | 2 | Nos | 378 ₹756 Lowest | 514 ₹1,028 |
| 7.00 | Cost of Retrieved Copper Wire (Less) | 7.2 | kg | 420 ₹3,024 | 400 ₹2,880 Lowest |
Tender Value
Refer Docs
Closing Date
12 Mar 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Unit I-Rewinding of one number 5.5KW,3 Phase, 50Hz,415V,NGEF make-released from OLCTCS-1B bed.
2026_EB_667407_1
CE-MTPSI-SE-ES-EMI-OT156-25-26
Open Tender
Electrical Works
Works
20 days
MTPS-I/METTURDAM
As per tender specification
4 documents required · 4 mandatory
₹0
Yes
13 May 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
Charges for Rewinding of one number 5.5 KW,3 phase,415V,NGEF make- Online Condenser Tube cleaning system (OLCTCS) motor including dismantling, cleaning, winding of the stator coils, applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling.
Charges for metal filling, machining and repairing of worn out shafts / bearing seating surfaces on DE and NDE sides, checking of bearing housings, providing sleeves in the end covers of one side of OLCTCS (if necessary)
Charges for Painting with 2 coats of OLCTCS motor 1 No.
Bearing 6308 2Z/C3 (SKF make) for Sl.No:621 054 79, OLCTC Motor - DE/NDE
Charges for standard make super enamelled copper wire (F class).
End Sleeves for DE/NDE covers for 5.5 KW motor.(if necessary)
Cost of Retrieved Copper Wire (Less)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_801785.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].