Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 CrAccepted-Finance AT JAGANNATH PADA PO KHOLAN TITLAGARH DIST BOLANGIR ODISHA 767077 | TITLAGARH | BOLANGIR | ODISHA | 767077 | ₹8.0 Cr | 1 | Accepted-Finance Won in lottery |
| 2 | 2₹8.0 CrSame as 1Rejected-Finance | ₹8.0 CrSame as 1 | 2 | Rejected-Finance Lost in lottery |
| 3 | 3₹8.5 Cr+₹47.2 L (5.88%)Rejected-Finance AT KHARIAR PO KHARLAR DIST NUAPADA | ₹8.5 Cr+₹47.2 L (5.88%) | 3 | Rejected-Finance Lost in financial bid |
| 4 | 3₹8.5 Cr+₹47.2 L (5.88%)Rejected-Finance | ₹8.5 Cr+₹47.2 L (5.88%) | 3 | Rejected-Finance Lost in financial bid |
| 5 | 3₹8.5 Cr+₹47.2 L (5.88%)Rejected-Finance AT 601 SAHID NAGAR BHUBANESWAR 751007 | BHUBANESWAR | KHORDHA | ODISHA | 751007 | ₹8.5 Cr+₹47.2 L (5.88%) | 3 | Rejected-Finance Lost in financial bid |
Tender Value
₹9.4 Cr
EMD Value
₹9.4 L
Closing Date
19 Jun 2025, 5:00 pmClosed
CCE Rand B CIRCLE BALANGIR
O/O CCE R and B CIRCLE BALANGIR
Building Work
2025_EICCL_114252_1
CCE (R and B) BGR-03-2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
330 days
Kantabanji
Please refer tender documents
4 documents required · 4 mandatory
₹10,000
₹9.4 L
Yes
28 Feb 2026
5 Jun 2025
20 Jun 2025
5 Jun 2025
19 Jun 2025
5 Jun 2025
5 Jun 2025 - 11 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL PORTION OF THE WORK:-Clearing and grubbing roads and land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 2,025 | Sqm | 8.45 | ₹17,111.25 |
| 2 | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge. | - | - | - | - |
| 3 | (a)Upto 1.5mtr Depth | 800.29 | Cum | 304.9 | ₹2,44,008.42 |
| 4 | (b) Beyond 1.5mtr to 3.00 mtr Depth | 275.29 | Cum | 326.9 | ₹89,992.3 |
| 5 | Filling the Foundation and Plinth, Sides of Foundation, etc. with excavated materials (excluding rock), in layers not exceeding 0.225 m in depth including cost of watering, ramming, dressing and levelling the top to proper level & gradient, cost of labour, conveyance, loading, unloading, T&P, etc, all complete as per the direction of Engineer-in-Charge. | - | - | - | - |
| 6 | (a)Ground Floor | 806.21 | Cum | 169.4 | ₹1,36,571.97 |
| 7 | Disposal of surplus/ excavated materials by mechanical means within 5km. Lead away from the site including cost of all labour , T&P complete as per the direction of the Engineer-in-charge. | - | - | - | - |
| 8 | (a)Ground Floor | 269.37 | Cum | 151.2 | ₹40,728.74 |
| 9 | Supplying, diluting and preparing chemical emulsion like Imidacloprid 30.5 % SC or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as Pre-Constructional Anti-termite Treatment confirming to IS 6313 (Part-II) and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. at the rate of 7.5 liters per sqm on vertical surface and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center (or as directed by the manufacturer) including the cost of all materials, cost of all labour, conveyance, loading, unloading, T&P, etc. all complete as per the direction of Engineer-in-Charge. | - | - | - | - |
| 10 | ( The payment shall be made on the basis of actual plinth area of the building at ground floor and vertical faces will not be measured for payment). Note- The contractor shall have to furnish Ten (10) years guarantees to maintain the anti-termite treated area / structure free from termite. In addition to the 10 years guarantee furnished as above, the contractor shall have to furnish ten years (after certificate of final completion) Bank Guarantee Bond issued by any Nationalized Bank executed in favour of the client as directed in the prescribed proforma available in the tender document for an amount of 10% (ten percent) of cost of this item of work. | 2,088.3 | Sqm | 41.2 | ₹86,037.96 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.85 MB
Tenderdocument.pdf
Tender Documents • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .