| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.7 LAccepted-AOC | ₹73.7 L | L1 | Accepted-AOC less than quoted Rate |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | A P CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve thedesired density including all labourcharges etc,complete as per technical specification and as directedby the departmental officers. Morth - Rev V No.
111,112,401,900 | 772.5 | M3 | 2,164.5 ₹11.1 L |
| 2.00 | Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 100mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications as per clause 406 of MORTH. | 515 | M3 | 2,469.2 ₹12.7 L |
| 3.00 | Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification | 5,150 | M2 | 85.7 ₹4.4 L |
| 4.00 | Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications. | 5,150 | M2 | 19.5 ₹1.0 L |
| 5.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5. | 257.5 | m2 | 10,576.3 ₹27.2 L |
| 6.00 | Providing and laying 40mm compacted thick Bituminous Concrete using 0.13 cum of 19.00-9.50mm mm IRC size HBG metal 0.17 cum of 9.50-2.36 mm IRC size HBG metal, 0.26cum of 2.36mm and blow with 45.27Kgs of VG30(60/70Bulk ) Bitumen and 5.03 Kgs Shreaded Plastic Waste for premixing per 10 sq.m including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 tonnes capacity conveying the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc., including labor for loading bitumen into bitumen tank and metal to feeder unit labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler tipper trucks, paver finisher,vibratory rollers etc., complete as per specification using CMP clause 507 of MORTH.Rev-5 | 154.5 | M3 | 11,130.9 ₹17.2 L |
Tender Value
₹89 L
EMD Value
₹89,000
Closing Date
28 Jan 2026, 3:00 pmClosed
EXECUTIVE OFFICER
C Pudupatti Town Panchayat
KNMT 2025 2026 Providing of BT Road at ward 2 Pattalamman Kovil Street in C Pudupatti Town panchayat
2026_DTP_642909_1
229/2025
Open Tender
Civil Works - Roads
180 days
C Pudupatti Town Panchayat Limit
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹89,000
Yes
C Pudupatti Town Panchayat
29 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
13 Jan 2026 - 28 Jan 2026
20 Jan 2026
Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve thedesired density including all labourcharges etc,complete as per technical specification and as directedby the departmental officers. Morth - Rev V No. 111,112,401,900
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 100mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications as per clause 406 of MORTH.
Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification
Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications.
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying 40mm compacted thick Bituminous Concrete using 0.13 cum of 19.00-9.50mm mm IRC size HBG metal 0.17 cum of 9.50-2.36 mm IRC size HBG metal, 0.26cum of 2.36mm and blow with 45.27Kgs of VG30(60/70Bulk ) Bitumen and 5.03 Kgs Shreaded Plastic Waste for premixing per 10 sq.m including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 tonnes capacity conveying the mix by tipper trucks to paver site spreading the mix in required temperature for uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and compaction by vibratory roller to the required density etc., including labor for loading bitumen into bitumen tank and metal to feeder unit labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler tipper trucks, paver finisher,vibratory rollers etc., complete as per specification using CMP clause 507 of MORTH.Rev-5
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_770478.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid