Tender Value
₹7.2 L
EMD Value
₹7,185
Closing Date
10 Oct 2024, 3:00 pmClosed
BDO (Bpt)
BDO (BPT), Needamangalam
REPAIRS TO PUE SCHOOL BUILDING (NORTH FACING ) TWO CLASS ROOM RCC BUILDING AT MANALUR IN KOVILVENNI PANCHAYAT 2. REPAIRS TO PUE SCHOOL TWO CLASS ROOM SSA BUILDING ( WEST FACING) AT AGARAHARAM IN KOVILVENNI PANCHAYAT
2024_RDTN_490845_1
3300/2024/a2
Open Tender
Civil Works
Item Rate
kovilvenni
REPAIRS TO PUE SCHOOL BUILDING (NORTH FACING ) TWO CLASS ROOM
RCC BUILDING AT MANALUR IN KOVILVENNI PANCHAYAT 2. REPAIRS TO PUE SCHOOL TWO CLASS
ROOM SSA BUILDING ( WEST FACING) AT AGARAHARAM IN KOVILVENNI PANCHAYAT
3 documents required · 3 mandatory
₹0
₹7,185
Yes
14 Oct 2024
4 Oct 2024
10 Oct 2024
4 Oct 2024
10 Oct 2024
4 Oct 2024
Amount
1. REPAIRS TO PUE SCHOOL BUILDING (NORTH FACING ) TWO CLASS ROOM RCC BUILDING AT MANALUR IN KOVILVENNI PANCHAYAT
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the Floor with Granolithic Flooring 1:2:4 thick including cost of materials and all labour charges etc
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Provision for New window. (1.20 x 1.30)
Provision for Tube Light (SD 89)
Provision for Ceiling Fan (SD 112)
Provision for Light&Fan Point(Open) SD 21 (SD 112)
Provision for 15th Amps Switch
Provision for Fibre Board
Provision for Bala Painting
Providing Chappal Rack Arrangements (SUB ESTIMATE)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Students Cubboard (Sub Estimate)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Spring Bundal
Provision for Display Board
Provision for Name Board
2. REPAIRS TO PUE SCHOOL TWO CLASS ROOM SSA BUILDING ( WEST FACING) AT AGARAHARAM IN KOVILVENNI PANCHAYAT
Dismantling the existing Damaged Cement Concrete including all labour charges etc., completed
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Provision for IWC
Repairs to window
Repairs to Door.
Provision for Bala Painting
Provision for CFL (SD 80)
Provision for Tube Light (SD 89)
Provision for Fibre Board
Providing Chappal Rack Arrangements (SUB ESTIMATE)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Students Cubboard (Sub Estimate)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Teachers Cubboard (Sub Estimate)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A VIJAY KUMAR (BID ID -1161280)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .