| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹8,464.22 (0.08%)Admitted-Finance | ₹1.1 Cr+₹8,464.22 (0.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | velmurugan.s L1 | Nayaraj.m L2 |
|---|---|---|---|---|---|
| 1.00Part 1: Providing CC Pavement from Andipatty BT road to Middle school H/O Pilathu Rs.11.92 lakhs | |||||
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 46.55 | cum | 83 ₹3,863.65 Lowest | 100 ₹4,655 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 97.44 | cum | 3,886.86 ₹3,78,735.64 Lowest | 3,886.86 ₹3,78,735.64 Lowest |
| 4.00 | Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete. | 356.85 | Sqm | 380 ₹1,35,603 Lowest | 380 ₹1,35,603 Lowest |
| 5.00 | CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 35.68 | cum | 4,557.11 ₹1,62,597.68 Lowest | 4,557.11 ₹1,62,597.68 Lowest |
| 6.00 | CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 69.82 | cum | 5,188.44 ₹3,62,256.88 Lowest | 5,188.44 ₹3,62,256.88 Lowest |
| 7.00 | Provision for Bitumen pad | 1 | No | 10,000 ₹10,000 Lowest | 10,000 ₹10,000 Lowest |
| 8.00 | Provision for Name Board | 1 | No | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,26,487 ₹1,26,487 Lowest | 1,26,582 ₹1,26,582 |
| 10.00Part 2 : Providing CC Pavement from Andipatty Mangai house to Mathi house H/O Pilathu Rs.11.92 lakhs | |||||
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
8 Feb 2021, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGUL
THE PROJECT DIRECTOR DRDA, DINDIGUL
Dindigul Dist - SCPAR 2020-2021 - Vadamadurai block CC pavement and Paver block works TN-05-04
2021_RDTN_192133_1
DIPR/333/Tender/2021 TN-05-04 Vadamadurai
Open Tender
Civil Works
Item Rate
180 days
DINDIGUL
Dindigul Dist - SCPAR 2020-2021 - Vadamadurai block CC pavement and Paver block works TN-05-04
5 documents required · 5 mandatory
₹0
₹1.1 L
THE PROJECT DIRECTOR DRDA, DINDIGUL
17 Feb 2021
22 Jan 2021
8 Feb 2021
22 Jan 2021
8 Feb 2021
29 Jan 2021
29 Jan 2021
Amount
Part 1: Providing CC Pavement from Andipatty BT road to Middle school H/O Pilathu Rs.11.92 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Providing CC Pavement from Andipatty Mangai house to Mathi house H/O Pilathu Rs.11.92 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 :Providing CC Pavement at East Malaipatty Alamarathupatty kalam to Jeganathan house H/O Paganatham Rs.3.65 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 4: Providing CC Pavement at Malaipatty Paraikalam H/O Paganatham Rs.8.09
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 5:Providing CC Pavement at Savadagoundenpatty BT road to Periyasamy house ( Via Ramar house) H/O Paganatham Rs.9.99 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 6: Providing CC Pavement at Ketchanipatty Burial ground road H/O Thennampatty Rs.4.01 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 7: Providing CC Pavement at Anna nagar Paramesh house to Subbaiya house H/O Thennampatty Rs.5.41 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 8: Providing CC Pavement at Anna nagar Muthu house to Murugeshan house H/O Thennampatty Rs.5.41 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 9: Providing CC Pavement at Anna nagar Muthan house to Chinnasamy house H/O Thennampatty Rs.5.41 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 10:Providing Paver block pavement at Sithuvarpatty kovil street H/O Sithuvarpatty Rs.5.68 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 11 : Providing Paver block pavement at Jangalpatty Kovil street H/O Paganatham Rs.5.21 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 12 : Providing CC Pavement at Poosaripatty Sakthivel house to Pitchai house H/O Sukkampatty Rs.5.30 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 13 :Providing CC Pavement at Ooranur H/O Komberipatty Rs.3.28 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 14 : Providing CC Pavement Malaikottai BT road to Fitter Murugeshan house H/O Sithuvarpatty Rs.10.87 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 15 :Providing CC Pavement Malaikottai Gounder house to Bhavathi chettiyar house H/O Sithuvarpatty Rs.4.04 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 16 :Providing CC Pavement at Kurumbapatty Mettu colony Vellaisamy house to Sekar house H/O Sukkampatty Rs.4.07 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 17 : Providing CC Pavement at Poosaripatty Pudupatty BT road to East Forest road H/O Sukkampatty Rs.4.49 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 18 : Providing CC Pavement at Poosaripatty Ayyavu house to Naduthambi house H/O Sukkampatty Rs.4.90 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Nayaraj.m
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .