Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-Finance 428 SURAJ PALACE C A ROAD GANDHIBAG NAGPUR MAHARASHTRA 440002 | NAGPUR | MAHARASHTRA | 440002 | 1 | Accepted-Finance Lowest Rate. | |
| 2 | 2₹6.0 L+₹25,411 (4.43%)Rejected-Finance | 2 | Rejected-Finance Higher Rate. | |
| 3 | 3₹6.1 L+₹39,477 (6.89%)Rejected-Finance | 3 | Rejected-Finance Higher Rate. | |
| 4 | Rejected-Technical | - | Rejected-Technical Technical Bid Found Not Ok. |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
23 Aug 2024, 12:00 pmClosed
SE EDC Etah
Vidhyut Colony, Aruna Nagar, Railway Road, Etah.
WORK OF bifurcation of 11 KV overload feeder and strengthening of LT Line in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.
2024_DVVNL_922901_4
126/2023-24/EDC ETAH
Open Tender
Electrical Works
Turn-key
Distt Etah
As per Tender Documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹6,000
29 Aug 2024
18 Aug 2024
23 Aug 2024
18 Aug 2024
23 Aug 2024
18 Aug 2024
Amount
Supply of The Line Material as per Relevent ISS :-
Stone Pad
TF Base Angle with Clamp
MS Top Channel
MS Dropper Channel
Guarding Angle
MS T off Channel with Clamp
11 KV F Clamp/F Bracket
LT PVC Cable 3.5x70/35 sq mm
LT Pin Clamp for STP
Double Pole Clamp
11 KV Fuse Set
Nut and Bolts off size
Suspension Clamp
I Hook
Dead and Clamp
Holding Clamp
3 Phase Distribution Box
3 Phase Distribution Box Clamp
GI Wire 10 SWG
Erection Work :-
Safe carriage of line material from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
Safe Carriage of 8.5 Mtr Long PCC Pole from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms. Including loading and unloading at both side
Safe Carriage of 11/13 Mtr Long ST Pole from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms. Including loading and unloading at both side
Safe Carriage of 100 KVA TF from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms. Including loading and unloading at both side.
Safe Carriate of following 11 KV XLPE Cable from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
11 KV XLPE Cable 3x120 sq mm
11 KV XLPE Cable 3x70 sq mm
Safe Carriate of 11 KVB VCB from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.
Erection of 8.5 mtr long PCC Pole as Double Pole/Section Pole including, drilling, cutting etc and fixing of all HT/LT accessories with TPMO etc complete, pole should be grouted properly as per DVVNL/RESPO norms.
Erection of 11/13 mtr ST Pole as single support including fixing of all HT/LT accessories etc. complet, pole should be grouted properly as per DVVNL/RESPO norms.
Erection of 11/13 mtr ST Pole as Double Pole/Section Pole including fixing of all HT/LT accessories etc. complete, pole should be grouted properly as per DVVNL/RESPO norms.
Dismantling and removal of existing ACSR Weasel/GI Wire from the various area, stacking and placement their coils and their in the safer place including cost of lobour T&P etc. required for proper completion of work.
Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
ACSR Weseal Conductor
11 KV XLPE Cable 3x120 sq mm
11 KV XLPE Cable 3x70 sq mm
AB Cable 3x95 sq mm
AB Cable 3x50 sq mm
AB Cable 3x120 sq mm (Double CKT)
Stone Pad
Suspension Clamp
Installation of 11 KV Cable Jointing Kit O/D 3x120/3x185
Installation of 11 KV O/G VCB CTR 200/100/5A 350 MVA
Erection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Earthing Complete
3 Phase Distribution Box with clamp
Dead and Clamp
11 KV Fuse Set
GI Wire 10 SWG
Mounting of 100 KVA TF on D/P including making of the connection etc. complete.
Repairing/Resagging/New guarding of HT lines with GI wire as per RESPO norms/specification.
Carriage of following old material (ACSR Weseal Conductor, X Arm Clamp etc.) from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.
ARABH ELECTRICAL
M/s APOORWA ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .