| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | +0.00% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 LAdmitted-Finance | +1.50% | ₹2.0 L | L2 | Admitted-Finance |
| 3 | L3₹2.0 LAdmitted-Finance | +2.50% | ₹2.0 L | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
14 May 2026, 5:00 pmClosed
SARPANCH AND GRAMPANCHAYAT ADHIKARI BHOSARE
GRAMPANCHAYAT BHOSARE TAL-MADHA
1.Constructing 300 mm RCC Gutter At Ward No.01 Bhosare Tq.Madha Dist.Solapur
2026_SOLAP_1301081_1
07/2026-27
Open Tender
Civil Works
180 days
GRAMPANCHAYAT BHOSARE TAL-MADHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
₹2,000
Yes
18 May 2026
7 May 2026
15 May 2026
7 May 2026
14 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Name Of Work:- 1.Constructing 300 mm RCC Gutter At Ward No.01 Bhosare Tq.Madha Dist.Solapur Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) | 15.36 | Cum | 165 | ₹2,534.4 | 1 |
| 2 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) | 11.52 | Cum | 187 | ₹2,154.24 | 2 |
| 3 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto 0 to 1.5 M) | 7.68 | Cum | 629 | ₹4,830.72 | 3 |
| 4 | Item No. 5 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. | 5.76 | Cum | 92 | ₹529.92 | 4 |
| 5 | Item No. 6 :-Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no.4985/1988 including all local and central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to the departmental stores and including cost of jointing material i.e. solvent cement, etc. complete. | 6 | Rmt | 160 | ₹960 | 5 |
| 6 | Item No. 7 :-Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, giving satisfactory hydraulic testing as per IS code, etc. complete. 90 mm Dia. PVC 4 Kgcm2 | 6 | Rmt | 35 | ₹210 | 6 |
| 7 | Item No. 8 :-Providing ISI standard RCC Pipes in standard lengths of following class & dia. Suitable for either coller joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. NP 2 Type RCC Pipe. | 48 | Rmt | 650 | ₹31,200 | 7 |
| 8 | Item No. 9 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. NP 2 Type RCC Pipe. | 48 | Rmt | 228 | ₹10,944 | 8 |
| 9 | Item No. 10 :- Providing and constructing B/B masonary Valve Chamber with 15 cm thick 1:3:6 proportion PCC bedding additoinal excavaton B.B. masonary in CM 1:5 cm thick precast RCCFrames and Cover etc. complete as directed by engineer incharge. Size Of a Chamber 0.6x0.45x0.90 | 8 | No | 7,386 | ₹59,088 | 9 |
| 10 | Chamber Repairing with new RCC Precast Cover. | 23 | No | 2,300 | ₹52,900 | 10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_2234094.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid