| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 CrAccepted-AOC VILLAGE BANSA POST KARWANDIA PS SASARAM DISTRICT ROHTAS STATE BIHAR PINCODE 821305 | ROHTAS | BIHAR | 821305 | L1 | Accepted-AOC DUE TO AGREEMENT DONE BY LOWEST BIDDER | |
| 2 | L2₹39.3 Cr+₹8.1 L (0.21%)Rejected-Finance VILL ANANTPUR P S GHOSHI DIST JEHANABAD | GAYA | BIHAR | 804403 | L2 | Rejected-Finance Due to L2 | |
| 3 | Rejected-Technical VILL P O KAMTA P S PARASI DIST ARWAL | ARWAL | BIHAR | 804401 | - | Rejected-Technical AS PER CMBD |
Tender Value
₹40.6 Cr
EMD Value
₹50.6 L
Closing Date
25 Apr 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Engineer-in-Chief RWD PATNA
Rural Works Department, Bihar 5th floor, Visvesvaraya Bhawan, Nehru Path, Patna-800015
RRSMP/24-25 Jehanabad/07
2025_RWD_140174_1
RRSMP/24-25 Jehanabad/07
Open Tender
CIVIL
Percentage
365 days
Jehanabad
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹50.6 L
22 Sept 2025
18 Apr 2025
25 Apr 2025
18 Apr 2025
25 Apr 2025
18 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | L105-MURHARA PATH To DEVNANDAN BIGHA (TRACK87) | - | - | - | - |
| 2 | Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I | 0.11 | Ha | 73,248.75 | ₹8,057.36 |
| 3 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | - | - | - |
| 4 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 196.88 | Sqm | 19.02 | ₹3,744.66 |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. For 1000 m lead @ 20 % | 108.9 | Cum | 243.88 | ₹26,558.53 |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. For 100 m lead @ 80 % | 435.61 | Cum | 162.93 | ₹70,973.94 |
| 7 | Granular Sub-base with Well Graded Material(Grade 2) : Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 69.07 | Cum | 2,117.86 | ₹1,46,280.59 |
| 8 | Water Bound Macadam with Stone Screening Gr-II : Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | - | - | - | - |
| 9 | Water Bound Macadam Gr III : Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 46.02 | Cum | 3,434.29 | ₹1,58,046.03 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. | 117.42 | Cum | 2,750.35 | ₹3,22,946.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Roadlistnit02.pdf
NIT • 0.81 MB
BOQ_218903.xls
BOQ • 2.52 MB
168541616.pdf
Tender Documents • 4.94 MB
168541618.html
Tender Documents • 0.05 MB
CMBD_RRSMP1.pdf
Tender Documents • 13.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .