Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC Lowest offer basis | |
| 2 | Rejected-Technical 489 TRIMOORTI NAGAR DAMOH NAKA JABALPUR 482002 | JABALPUR | JABALPUR | MADHYA PRADESH | 482002 | - | Rejected-Technical Firm has not uploaded Order copies as per PQR clause no.5 (b) |
| Sl No | Description | Qty | Unit | Siddhesh Electricals L1 |
|---|---|---|---|---|
| 1.00“Work contract for muffing and strengthening of street lighting poles at 2x600MW SSTPP,MPPGCL,Khandwa(M.P).” | ||||
| 1.01 | Muffing of street light poles
a. Breaking the old damaged muffing & construct new muffing with slanting top
(breaking damaged muffing only)
b. Excavation of muffing (Qty of excavation 0.6x0.6x0.6 mtr.)
c. The exposed pole below ground level should be painted by coal tar compound so that corrosion is avoided.
d. Muffing to pole with M-15 concreting (Qty of concreting 0.6x0.6x1.2 mtr.)
e. Essential material required to complete the above work is in the scope of contractor.
. | 700 | Nos | 2,828.46 ₹19,79,922 Lowest |
Tender Value
₹22.8 L
EMD Value
₹45,600
Closing Date
26 Jul 2023, 3:30 pmClosed
S.E.(Works),SSTPP
O/o Addl.CE(PnW)
Work contract for muffing and strengthening of street lighting poles at 2x600MW SSTPP, MPPGCL, Khandwa(M.P
2023_MPPGC_276460_1
WT-1976
Open Tender
Miscellaneous Works
Lump-sum
365 days
SSTPP, MPPGCL, Dongalia
as perNIT
16 documents required · 16 mandatory
₹1,000
Yes
₹45,600
Yes
15 Oct 2025
5 Jun 2023
28 Jul 2023
5 Jun 2023
26 Jul 2023
5 Jun 2023
“Work contract for muffing and strengthening of street lighting poles at 2x600MW SSTPP,MPPGCL,Khandwa(M.P).”
Muffing of street light poles a. Breaking the old damaged muffing & construct new muffing with slanting top (breaking damaged muffing only) b. Excavation of muffing (Qty of excavation 0.6x0.6x0.6 mtr.) c. The exposed pole below ground level should be painted by coal tar compound so that corrosion is avoided. d. Muffing to pole with M-15 concreting (Qty of concreting 0.6x0.6x1.2 mtr.) e. Essential material required to complete the above work is in the scope of contractor. .
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .