Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 CrAccepted-Finance | ₹24.1 Cr | L1 | Accepted-Finance Financially Successful |
| 2 | L2₹25.0 CrRejected-Finance | ₹25.0 Cr | L2 | Rejected-Finance Financially Unsuccessful |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹22.9 Cr
EMD Value
₹33 L
Closing Date
9 Mar 2026, 12:00 pmClosed
Executive Director
1st Floor, Atal Stadium, Cujira, St Cruz, Goa
Construction Of Sports Complex for Shree Balaram Residential School at Amone Canacona Goa
2026_TSAG_27907_1
SAG/EE-ED/TECH/F08/25-26/4759
Open Tender
Miscellaneous Works
Percentage
365 days
Canacona
Please refer Tender documents.
3 documents required · 3 mandatory
₹40,000
₹33 L
1st Floor, Atal Stadium, Cujira, St Cruz, Goa
20 May 2026
23 Feb 2026
10 Mar 2026
23 Feb 2026
9 Mar 2026
3 Mar 2026
23 Feb 2026 - 26 Feb 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 1,800 | Sqm | 49.8 | ₹89,640 |
| 2.1 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads : Beyond 30 cm and upto 60 cm grith | 10 | No. | 498 | ₹4,980 |
| 2.2 | Beyond 60 cm and upto 120 cm grith | 10 | No. | 1,153 | ₹11,530 |
| 2.3 | Beyond120 cm and upto 240 cm grith | 10 | No. | 5,014 | ₹50,140 |
| 2.4 | Beyond 240 cm girth | 10 | No. | 9,929 | ₹99,290 |
| 3 | Surface dressing of ground including removing vegetation in equalities not exceeding 15 cm deep and disposal of rubbish lead upto 50 m and lift upto 1.5 m. Ordinary Rock | 1,800 | Sqm | 26 | ₹46,800 |
| 4 | Earthwork in surface excavation not exceeding 30 cm depth (but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: Ordinary Rock | 250 | Sqm | 48 | ₹12,000 |
| 5.1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas(Upto any depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as
directed in : All kinds of soil | 1,800 | Cum | 286 | ₹5,14,800 |
| 5.2 | All type of ordinary rock including all type of laterite rock, blasting prohibited | 3,600 | Cum | 639 | ₹23,00,400 |
| 6 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead
of 50 m. All kinds of soil. | 265 | Cum | 291 | ₹77,115 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.03 MB
Tendernotice_2.pdf
PDF • 1.49 MB
Tendernotice_3.pdf
PDF • 2.14 MB
Tendernotice_4.pdf
PDF • 2.22 MB
Tendernotice_5.pdf
PDF • 1.06 MB
Tendernotice_6.pdf
PDF • 1.52 MB
Tendernotice_7.pdf
PDF • 1.10 MB
Tendernotice_8.pdf
PDF • 1.96 MB
BOQ_28353.xls
BOQ • 0.84 MB
corrigendum01.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].