Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance F 16 GANESH SHANKAR VIDYARTHI NAGAR PANKI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹10.0 L | L1 | Accepted-Finance FOUND OK |
| 2 | L2₹10.0 L+₹3,765 (0.38%)Accepted-Finance | ₹10.0 L+₹3,765 (0.38%) | L2 | Accepted-Finance FOUND OK |
| 3 | L3₹10.1 L+₹16,465 (1.65%)Accepted-Finance | ₹10.1 L+₹16,465 (1.65%) | L3 | Accepted-Finance FOUND OK |
| Sl No | Description | Qty | Unit | M/S SWASTIC CONTRUCTION L2 | M/S J P CONSTRACTION COMPANY L3 | POOJA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki to site of work. | ||||||
| 1.01 | PCC Pole 11 Mtr | 4 | Nos. | 1,800 ₹7,200 Lowest | 1,850 ₹7,400 | 2,000 ₹8,000 |
| 1.02 | 11/0.4 KV VCB for O/G CTR 200/100/5 A. (350 MVA 1250 AMP | 1 | Nos. | 8,200 ₹8,200 | 8,300 ₹8,300 | 8,000 ₹8,000 Lowest |
| 1.03 | Earthing Set Complete | 4 | Nos. | 60 ₹240 | 65 ₹260 | 50 ₹200 Lowest |
| 1.04 | 11 KV XLPE Cable 3x185 Sq.mm. | 770 | Mtr. | 60 ₹46,200 | 65 ₹50,050 | 50 ₹38,500 Lowest |
| 1.05 | 11 KV 3x185 sqmm XLPE O/D Cable Box | 10 | Nos. | 50 ₹500 Lowest | 55 ₹550 | 50 ₹500 Lowest |
| 1.06 | 11 KV 3x185 sqmm XLPE I/D Cable Box | 2 | Nos. | 50 ₹100 Lowest | 55 ₹110 | 50 ₹100 Lowest |
| 1.07 | 11 KV 3x185 sqmm XLPE O/D Cable Box Straight Through | 2 | Nos. | 50 ₹100 Lowest | 55 ₹110 | 50 ₹100 Lowest |
| 2.00 | Dragging of pole from JE Dump Store to site | 4 | Nos. | 1,500 ₹6,000 Lowest | 1,510 ₹6,040 | 1,500 ₹6,000 Lowest |
| 3.00 | Grouting of Pole in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mmx45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per respo norms. | 4 | Nos. | 1,250 ₹5,000 Lowest | 1,260 ₹5,040 | 1,250 ₹5,000 Lowest |
Tender Value
₹10.2 L
EMD Value
₹10,200
Closing Date
8 Jun 2026, 5:00 pmClosed
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
26/2026-27/
2026_MVVNL_1156261_1
26/2026-27/EDC BARABANKI
Open Tender
Electrical Works
Fixed-rate
30 days
EDD FATEHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC BARABANKI
₹10,200
10 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki to site of work. | |||||
| 1.01 | PCC Pole 11 Mtr | 4 | Nos. | - | - |
| 1.02 | 11/0.4 KV VCB for O/G CTR 200/100/5 A. (350 MVA 1250 AMP | 1 | Nos. | - | - |
| 1.03 | Earthing Set Complete | 4 | Nos. | - | - |
| 1.04 | 11 KV XLPE Cable 3x185 Sq.mm. | 770 | Mtr. | - | - |
| 1.05 | 11 KV 3x185 sqmm XLPE O/D Cable Box | 10 | Nos. | - | - |
| 1.06 | 11 KV 3x185 sqmm XLPE I/D Cable Box | 2 | Nos. | - | - |
| 1.07 | 11 KV 3x185 sqmm XLPE O/D Cable Box Straight Through | 2 | Nos. | - | - |
| 2 | Dragging of pole from JE Dump Store to site | 4 | Nos. | - | - |
| 3 | Grouting of Pole in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mmx45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per respo norms. | 4 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
Tenderno26.pdf
Tender Documents • 1.29 MB
BOQ_2166343.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .