| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.4 L+₹0.02 (<0.01%)Accepted-AOC | L2 | Accepted-AOC L2 |
Tender Value
₹39.4 L
EMD Value
₹78,798
Closing Date
4 Jan 2025, 3:00 pmClosed
EXECUTIVE ENGINEER SIBSAGAR AND DEMOW RD. DIVN
O/T EXECUTIVE ENGINEER SIBSAGAR AND DEMOW RD. DIVN
Construction of road Kulapothar 2No. Padumoni Village Namchang Changmai Gaon Road Naojan Sokoliya Path Borkuri Chetia Gaon Sri Sri Sankar Mandir Path Kalatani Ali under SOPD(G) for the year 2024-25 under Siv and Demow Territorial Rd Divn pkg 3
2024_PWD_41670_1
2024_PWD_41370_1
Open Tender
Civil Works – Roads
Works
90 days
Kulapothar 2No. Padumoni Village Namchang Changmai
AS PER DNIT
4 documents required · 4 mandatory
₹788
₹78,798
Yes
17 Jan 2025
25 Dec 2024
6 Jan 2025
25 Dec 2024
4 Jan 2025
25 Dec 2024
25 Dec 2024 - 4 Jan 2025
Amount
Kulapothar 2No. Padumoni Village (L= 808.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Namchang Changmai Gaon Road (L= 450.00m
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Naojan Sokoliya Path (L= 450.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Borkuri Chetia Gaon, (L= 500.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Sri Sri Sankar Mandir Path (L= 500.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Kalatani Ali (L= 150.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
DULU SAIKIA (BID ID -253183)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .