| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.2 LAccepted-AOC | L1 | Accepted-AOC M/s Fateh Enterprises is L1 | |
| 2 | L2₹36.8 L+₹1.7 L (4.87%)Rejected-Finance | L2 | Rejected-Finance Quoted other than lowest rate | |
| 3 | L3₹37.3 L+₹2.2 L (6.34%)Rejected-Finance H NO 18 SHEET NO 5 A KATIA COLONY NAMDEV MARG BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | L3 | Rejected-Finance Quoted other than lowest rate | |
| 4 | L4₹38.9 L+₹3.8 L (10.9%)Rejected-Finance | L4 | Rejected-Finance Quoted other than lowest rate | |
| 5 | L5₹40.5 L+₹5.4 L (15.4%)Rejected-Finance | L5 | Rejected-Finance Quoted other than lowest rate |
| Sl No | Description | Qty | Unit | V K CONTRACTOR L3 | AABIA CONSTRUCTION L2 | M/s DHEERAJ JAIN CONSTRUCTION COMPANY L7 | ANNPOORNA ENGINEERS & BUILDERS L8 | JAGMEET SINGH CONTRACTOR L5 | G N CONSTRUCTIONS L4 | K L JINDAL AND CO. L6 | FATEH ENTERPRISES L1 | Batra Builders L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down and refixing or removing to store 15 mm dia steel tubing pipe connections, including cleaning of the pipes and fittings, complete in all respects, as specified and as directed by the Engineer-in-Charge. | 450 | Running Metre | 10 ₹4,500 Lowest | 10 ₹4,500 Lowest | 20 ₹9,000 | 20 ₹9,000 | 50 ₹22,500 | 10 ₹4,500 Lowest | 10 ₹4,500 Lowest | 10 ₹4,500 Lowest | 60 ₹27,000 |
| 2.00 | Supply and laying CPVC pipes SDR-11 of 16 mm outer diameter, including all necessary CPVC plain and socket fittings such as tees, elbows, couplers, reducers, unions, etc., fixed on walls/ceilings with clamps or laid in floors, complete in all respects as specified and directed by the Engineer-in-Charge. | 450 | Running Metre | 200 ₹90,000 | 189.23 ₹85,153.5 | 300 ₹1,35,000 | 200 ₹90,000 | 180 ₹81,000 | 120 ₹54,000 Lowest | 200 ₹90,000 | 170 ₹76,500 | 190 ₹85,500 |
| 3.00 | Taking down and refixing or removing to store 20 mm dia steel tubing pipe connections, including cleaning of the pipes and fittings, complete in all respects, as specified and as directed by the Engineer-in-Charge. | 600 | Running Metre | 20 ₹12,000 | 10 ₹6,000 Lowest | 20 ₹12,000 | 20 ₹12,000 | 50 ₹30,000 | 10 ₹6,000 Lowest | 10 ₹6,000 Lowest | 10 ₹6,000 Lowest | 70 ₹42,000 |
| 4.00 | Supply and laying CPVC pipes SDR-11 of 20 mm outer diameter, including all necessary CPVC SDR-11 plain and socket fittings, fixed on walls/ceilings with suitable clamps or laid in floors, complete in all respects as specified and directed by the Engineer-in-Charge. | 600 | Running Metre | 200 ₹1,20,000 | 235.23 ₹1,41,138 | 325 ₹1,95,000 | 250 ₹1,50,000 | 200 ₹1,20,000 | 134 ₹80,400 Lowest | 250 ₹1,50,000 | 220 ₹1,32,000 | 240 ₹1,44,000 |
| 5.00 | Cutting chases, pinning in, making good to facings where required, and pointing in cement mortar 1:3 to ends or edges of landings, steps, sills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring and making good, not exceeding 10 cm in girth, complete all as specified and directed by the Engineer-in-Charge. | 150 | Running Metre | 50 ₹7,500 | 50 ₹7,500 | 50 ₹7,500 | 25 ₹3,750 | 20 ₹3,000 Lowest | 34 ₹5,100 | 30 ₹4,500 | 50 ₹7,500 | 40 ₹6,000 |
| 6.00 | Demolition of brickwork or stone/boulder masonry, kerb stones, built in cement mortar or cement-lime mortar, including all quoins, arches, pillars, etc., but excluding ashlar facings, dressed stonework, and precast concrete articles, complete in all respects as specified and as directed. | 10 | Cubic Metre | 20 ₹200 Lowest | 500 ₹5,000 | 200 ₹2,000 | 350 ₹3,500 | 400 ₹4,000 | 1,392 ₹13,920 | 200 ₹2,000 | 100 ₹1,000 | 500 ₹5,000 |
| 7.00 | Providing material and labour for brick work using sub-class ‘B’ old size burnt clay bricks, straight or curved on plan exceeding 6 metre mean radius, built in cement mortar (1:4), including demolition of existing bricks or brick tiles in floors, channels, kerbs, aprons, etc. (each layer), bedded and pointed in any mortar. the item includes all materials, labour, scaffolding, tools, tackles, curing, raking out joints, finishing and all incidental charges complete in all respects as specified and as directed. | 8 | Cubic Metre | 4,500 ₹36,000 | 4,450 ₹35,600 | 4,000 ₹32,000 | 5,000 ₹40,000 | 5,500 ₹44,000 | 3,840 ₹30,720 Lowest | 4,000 ₹32,000 | 5,000 ₹40,000 | 6,000 ₹48,000 |
| 8.00 | Providing material and labour for brick work using sub-class ‘B’ old size burnt clay bricks, straight or curved on plan exceeding 6 metre mean radius, built in cement mortar (1:6), including demolition of existing bricks or brick tiles in floors, channels, kerbs, aprons, etc. (each layer), bedded and pointed in any mortar. the item includes all materials, labour, scaffolding, tools, tackles, curing, raking out joints, finishing and all incidental charges complete in all respects as specified and as directed. | 8 | Cubic Metre | 4,500 ₹36,000 | 4,400 ₹35,200 | 4,000 ₹32,000 | 5,000 ₹40,000 | 5,500 ₹44,000 | 3,840 ₹30,720 | 2,500 ₹20,000 Lowest | 4,800 ₹38,400 | 5,600 ₹44,800 |
| 9.00 | Taking down cement or cement lime plaster from brick wall etc including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 1,200 | Square Metre | 10 ₹12,000 Lowest | 10 ₹12,000 Lowest | 25 ₹30,000 | 15 ₹18,000 | 50 ₹60,000 | 19 ₹22,800 | 10 ₹12,000 Lowest | 15 ₹18,000 | 15 ₹18,000 |
| 10.00 | Material and labour for providing and applying 15 mm thick ready-mix cement plaster on external surfaces of brick masonry walls, chajjas, fins, and concrete surfaces, including preparation of surface by cleaning, removing loose particles, hacking and wetting where required; application of ready-mix plaster in required thickness; finishing the surface even, fair, and true to line, level and plumb without using extra cement; curing, scaffolding, and all incidental works; complete in all respects, as specified and directed by the Engineer-in-Charge. | 1,200 | Square Metre | 250 ₹3,00,000 | 250 ₹3,00,000 | 250 ₹3,00,000 | 330 ₹3,96,000 | 220 ₹2,64,000 | 288 ₹3,45,600 | 300 ₹3,60,000 | 200 ₹2,40,000 Lowest | 450 ₹5,40,000 |
Tender Value
₹50.0 L
EMD Value
₹99,980
Closing Date
24 Jun 2026, 6:00 pmClosed
Jitender Singh IDSE
GE (North) Bathinda
PETTY REPAIRS IN TEMP BLDGS IN OTM ACCN UNDER AGE B/R-V OF GE (N) BATHINDA AT BATHINDA MIL STN
2026_MES_756287_2
8940/NIT-21/25-26/E8
Open Tender
Civil Works
Item Rate
120 days
Bathinda
Class D Category a(i)
8 documents required · 8 mandatory
₹500
GE (North) Bathinda
₹99,980
Yes
31 Jul 2026
10 Jun 2026
26 Jun 2026
11 Jun 2026
24 Jun 2026
17 Jun 2026
13 Jun 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down and refixing or removing to store 15 mm dia steel tubing pipe connections, including cleaning of the pipes and fittings, complete in all respects, as specified and as directed by the Engineer-in-Charge. | 450 | Running Metre | - | - |
| 2 | Supply and laying CPVC pipes SDR-11 of 16 mm outer diameter, including all necessary CPVC plain and socket fittings such as tees, elbows, couplers, reducers, unions, etc., fixed on walls/ceilings with clamps or laid in floors, complete in all respects as specified and directed by the Engineer-in-Charge. | 450 | Running Metre | - | - |
| 3 | Taking down and refixing or removing to store 20 mm dia steel tubing pipe connections, including cleaning of the pipes and fittings, complete in all respects, as specified and as directed by the Engineer-in-Charge. | 600 | Running Metre | - | - |
| 4 | Supply and laying CPVC pipes SDR-11 of 20 mm outer diameter, including all necessary CPVC SDR-11 plain and socket fittings, fixed on walls/ceilings with suitable clamps or laid in floors, complete in all respects as specified and directed by the Engineer-in-Charge. | 600 | Running Metre | - | - |
| 5 | Cutting chases, pinning in, making good to facings where required, and pointing in cement mortar 1:3 to ends or edges of landings, steps, sills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring and making good, not exceeding 10 cm in girth, complete all as specified and directed by the Engineer-in-Charge. | 150 | Running Metre | - | - |
| 6 | Demolition of brickwork or stone/boulder masonry, kerb stones, built in cement mortar or cement-lime mortar, including all quoins, arches, pillars, etc., but excluding ashlar facings, dressed stonework, and precast concrete articles, complete in all respects as specified and as directed. | 10 | Cubic Metre | - | - |
| 7 | Providing material and labour for brick work using sub-class ‘B’ old size burnt clay bricks, straight or curved on plan exceeding 6 metre mean radius, built in cement mortar (1:4), including demolition of existing bricks or brick tiles in floors, channels, kerbs, aprons, etc. (each layer), bedded and pointed in any mortar. the item includes all materials, labour, scaffolding, tools, tackles, curing, raking out joints, finishing and all incidental charges complete in all respects as specified and as directed. | 8 | Cubic Metre | - | - |
| 8 | Providing material and labour for brick work using sub-class ‘B’ old size burnt clay bricks, straight or curved on plan exceeding 6 metre mean radius, built in cement mortar (1:6), including demolition of existing bricks or brick tiles in floors, channels, kerbs, aprons, etc. (each layer), bedded and pointed in any mortar. the item includes all materials, labour, scaffolding, tools, tackles, curing, raking out joints, finishing and all incidental charges complete in all respects as specified and as directed. | 8 | Cubic Metre | - | - |
| 9 | Taking down cement or cement lime plaster from brick wall etc including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 1,200 | Square Metre | - | - |
| 10 | Material and labour for providing and applying 15 mm thick ready-mix cement plaster on external surfaces of brick masonry walls, chajjas, fins, and concrete surfaces, including preparation of surface by cleaning, removing loose particles, hacking and wetting where required; application of ready-mix plaster in required thickness; finishing the surface even, fair, and true to line, level and plumb without using extra cement; curing, scaffolding, and all incidental works; complete in all respects, as specified and directed by the Engineer-in-Charge. | - | Square Metre | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.16 MB
tenderdocuments.pdf
Tender Documents • 1.14 MB
BOQ_863534.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .