| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.9 LAdmitted-Finance | -1.00% | ₹78.9 L | L1 | Admitted-Finance |
| 2 | L2₹79.7 LAdmitted-Finance | +0.00% | ₹79.7 L | L2 | Admitted-Finance |
| 3 | L3₹79.8 LAdmitted-Finance R O THIKSEY | LEH LADAKH | LADAKH | 194101 | +0.10% | ₹79.8 L | L3 | Admitted-Finance |
Tender Value
₹79.7 L
EMD Value
₹1.9 L
Closing Date
27 Apr 2026, 2:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
strengthening of FCS n CA campus Agling Leh.(By way of GSB 150mm thick, 100mm thick WMM , 50mm thick BM and SDB )
2026_PWD_18643_4
CDL 183 of Leh of 2025-26
Open Tender
Civil Works - Roads
30 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer Construction Division Leh
₹1.9 L
5 May 2026
25 Apr 2026
27 Apr 2026
25 Apr 2026
27 Apr 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 (plant mix Method) | 836.25 | Cum | 1,869.03 | ₹15,62,976.34 | item 01 |
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 557.5 | Cum | 1,825.11 | ₹10,17,498.83 | item 02 | |
| 3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge.
50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 278.75 | Cum | 9,038.27 | ₹25,19,417.76 | item 03 |
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
25 mmcompacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 5,575 | Sqm | 300.19 | ₹16,73,559.25 | item 04 | |
| 5 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.With rapid setting bitumen emulsion
On W.B.M / W.M.M. @ 0.4kg/sqm | 5,575 | Sqm | 52.29 | ₹2,91,516.75 | item 05 |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade VG- 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg / sqm | 5,575 | Sqm | 57.72 | ₹3,21,789 | item 06 |
| 7 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. | 5,575 | Sqm | 104.69 | ₹5,83,646.75 | item 07 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_44994.xls
BOQ • 0.27 MB