| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAccepted-AOC 241 SECTOR 7 PANCHKULA | ₹42.6 L | L1 | Accepted-AOC Agency Quoted less than departments justify rates. |
| 2 | L2₹43.6 L+₹1.1 L (2.55%)Rejected-Finance 2ND FLOOR SCO 17 HARMILAP NAGAR PHASE 1 DERABASSI PB | PATIALA | PUNJAB | 140401 | ₹43.6 L+₹1.1 L (2.55%) | L2 | Rejected-Finance Agency Quoted less than departments justify rates but on Higher Side |
| 3 | Rejected-Technical 1627 SECTOR 26 PANCHKULA | PANCHKULA | HARYANA | 133301 | - | - | Rejected-Technical Not in Order GST acknowledgment return filled submitted is not up to date. |
Tender Value
₹45.2 L
EMD Value
₹90,440
Closing Date
5 Mar 2026, 12:00 pmClosed
Exe. Engineer Roads Division No 3 MC Chandigarh
Exe. Engineer Roads Division No 3 MC Chandigarh
UPGRADATION OF FLOORING OF AT FRONT SIDE OR BACK SIDE OF SCO NO 1 TO 10, BOOTH MARKET, SCO 80-94 AND BOOTH NO 1-12 IN SECTOR 24 C and D CHANDIGARH.
2026_MCC_90716_2
MCC/2026/ROADS-III/02-08
Open Tender
Civil Works - Others
Percentage
120 days
Work
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
₹90,440
29 Jun 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing Kerb of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | Rmt | - | - |
| 2 | Taking out existing Channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | Rmt | - | - |
| 3 | Taking out existing CC interlocking paver blocks from footpath/central verge, including removal of rubbish etc. disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer in Charge. (N.S.) | - | Sqm | - | - |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. | - | Sqm | - | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be leveled and neatly dressed. (DSR 2.6.1) | - | Cum | - | - |
| 6 | Disposal moorum/building rubbish/malba/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer -in- charge. | - | Cum | - | - |
| 7 | Carriage of mechanical transport including loading, unloading Lead of 5 km at Dumping Ground complete in all respect to the entire satisfaction of the Engineer-In-Charge. (DSR 1.1.2) | - | Cum | - | - |
| 8 | Laying at or near ground level factory made old kerb stone made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). | - | Rmt | - | - |
| 9 | Providing and laying at or near ground level factory made kerb stone of size 2'x9'x4"made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). | 1 | Rmt | - | - |
| 10 | Laying at or near ground level factory made old channel made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished channel edging shall be measured to calculate volume for payment). | - | Rmt | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.70 MB
BOQ_111086.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .