Loading…
Loading…
Tender Value
₹63.1 L
EMD Value
₹1.3 L
Closing Date
24 Sept 2026, 4:00 pm
Xen RnB Div Tangdar
Xen RnB Div Tangdar
Construction of Wall Clock Tower at Tangdar
2026_PWDJK_323995_1
ENIT 62 RnB Div Tangdar 2026-27
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Yes
Convener, purchase committee, Directorate of ISM
₹1.3 L
Yes
9 Sept 2026
9 Sept 2026
25 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manuall means (hydraulic e cavator) in trenches for foundations, drains, pipes, cables etc. (not e ceeding 1.5 m in width) and for shafts, wells, cesspits and the like not e ceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out e cavated earth and disposal of surplus e cavated earth as directed, within a lead of 0.50 Km All kinds of soil: | 95.79 | cum | 479.3 | ₹45,912.15 |
| 2 | P/L dry Stone Soling duly hand packed & consolidated with hand rammers incl.all carriage complete Job. | 11.38 | cum | 900 | ₹10,242 |
| 3 | P/L, in position cement concrete of specified grade e cluding the cost of centering & shuttering. All work up to plinth level in 1: 4: 8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm NS). | 7.89 | cum | 5,202.9 | ₹41,050.88 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including curing but e cluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. | 24.5 | cum | 7,788.4 | ₹1,90,815.8 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but e cluding the cost of centring and shuttering. All work upto plinth level with 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). | 22.88 | cum | 6,591.25 | ₹1,50,807.8 |
| 6 | RCC Work in beams, suspended floors roofs having slope upto 15° Landing balconies, shelves, lintels upto floor 5 level including curing but e cluding the cost of centring, shuttering, finishing and reinforcement with 1: 1½: 3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm NS). | 7.63 | cum | 9,821.85 | ₹74,940.72 |
| 7 | RCC Work in walls (any thickness) including attached pilasters, columns, pillars, posts and struts upto floor five level including curing but e cluding the cost of centring, shuttering, finishing and reinforcement with 1: 1½: 3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm NS.) | 12.23 | cum | 9,395.7 | ₹1,14,909.41 |
| 8 | Reinforcement for RCC works including straightening, cutting, bending, binding & placing in position all complete. TMT reinforcement of grade Fe-500D steel bars at all levels. | 11,277.35 | kg | 123.2 | ₹13,89,369.52 |
| 9 | Centring and shuttering including Strutting, proping etc & removal for: Founadtions, footings, bases of columns for mass concrete All Work upto plinth Level | 120.93 | sqm | 286.35 | ₹34,628.31 |
| 10 | Centring and shuttering including Strutting, proping etc & removal for Lintels, beams, plinth beams, girders bressumers & cantilivers | 50.54 | sqm | 577.55 | ₹29,189.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_1092198.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .