| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical PQR Not Qualifide |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
30 Mar 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EWC BASTI
INCREASING CAPACITY AND BIFURCATION OF 11 KV LINES FROM 33 11 KV HARRAIYA TEHSIL PREMISES 1X5 TO 2X5 MVA DISTT BASTI FOR 33 11 KV SS HARRAIYA GRAMIN BASTI
2024_PVVNV_917135_1
28/EWC(B)/2023-24
Open Tender
Electrical Works
Lump-sum
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹3,540
SE EWC
₹35,000
6 Apr 2024
14 Mar 2024
30 Mar 2024
14 Mar 2024
30 Mar 2024
14 Mar 2024
Decentralised Items SS
Control Cable
Rubber Mat
Alluminium P.G. Clamp for Dog
24 volt Battery and inverter set
Substation Works
Shifting, Loading & Carriage of following material from store center Basti to 33/11 KV S/S harraiya basti
Shifting, Loading & Carriage from store center to work site including succesfully loading,unloading & proper stacking of 33 KV L.A./33 KV fuse,Post Insulator,Bus isolator,Top channel ,structures etc.including T&P and Labour.
Shifting, Loading & Carriage from store center to work site including succesfully loading,unloading & proper stacking of 33 KV transformer control Pannel, 33 KV VCB with structure,11 kv vcb, C.T. Complete with structure ,including T&P and Labour.
Shifting, Loading & Carriage from store center to work site including succesfully loading,unloading & proper stacking of 11 kv 3*300 sqmm and 3*120sqmm sqmm XLPE cables including T&P and Labour.
Construction of Plinth & foundation for new 33 KV VCB structure.
Erection & grouting of 33 KV VCB Structure ,33 KV LA Structure.,33 KV fuse set,Bus isolator structure,Post insulator structure,33 KV CT structure. with structure including T&P and labour.
Mounting & fitting of 33 KV VCB & 33 KV C.T.,33 KV Bus isolator on erected Structure with complete fitting,including T&P and Labour.
Mounting & fitting of 33 KV LA & 33 KV Fuse set,33 KV Post insulator, on erected Structure with complete fitting,including T&P and Labour.
Dismentling of Existing security fencing & re-erection after completion of work,including all T&P and labour.
Making of new 5MVA transformer plinth,including all T&P, material and labour.
Shifting/Dragging of 5 MVA T/F about 50 Mtr. distance & placing on Plinth, Erection of conservator tank, radiators,silica gel box,Air vent,filling of T/F oil,removing of air trapped in Transformer,tightening of LV/HV bushing,making LV/HV connections, including T&P and Labour.
Shifting/removing/Dismantalling of old switchgear panels to make space for new switchgear panels, including all T&P and labour.
Installation of new 11 KV Incoming VCB, 11 KV outgoing VCB, 11 KV Bus coupler, 33 KV transforme control panel in control room,including all T&P and labour.
Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour.
Erection and grouting of Neutral stand and cable stand including all material, labour and T&P.
Laying of 11 KV Cable by digging of trench,properly laying of 11KV 3*300sqmm,3*120sqmm cable in it with bricks and sand including cost of brick,sand,T&P and labour.
Cable jointing charges with cable jointing kit.
Installation battery and invertor with cabinet in control room along with its proper connections
Termination of 11 kv cable with Transformer and 11 Kv panels,including, all T&P and labour.
Laying of 11 KV Cable in air with 6 inch GI pipe
Laying of Control Cable of size 2*2.5sqmm
Laying of Control Cable of size 4*2.5sqmm
Making control cable drawing, termination and making proper connections including providing ferrules with switchgear equipments from 33 KV Transformer control panel to 33/11 KV power transformers Bucholz relay,OTI,WTI,etc, 33 KV Transformer control panel to 33 VCB & 33 KV C.T.,33 KV PTs,11 KV VCB panels,giving AC/DC supply including all T&P and labour.
Power TF 1 no. Delta neutral earthing ,with providing (gi pipe 1.5 inch 20 mtr length of each pipe 1 no.of copper cone and 6 mmsq copper wire as per req.)with coal and salt, copper flexible mess including all T&P and labour.
Power Transformer 2 no. body earthing ,with providing(GI pipe 1.5 inch dia 20 mtr length of each pipe 1 no.of copper cone and 6 mmsq copper wire as per req.)with coal and salt and welding it with earthmat including all T&P and labour.
Making HV connection with ACSR Dog conductor from 33 kv bus-bar to 33 KV post insulator-33 KV bus isolator-33 KV fuse set-33 KV VCB-33 KV CTs-33 KV LA-33/11 KV power transformer, including all T&P and labour as per site requirements.
Earthmat half of switchyard area including supply and fabrication with all T&P and Labour.
Earthing of indoor and outdoor Equipments with existing earthing arrangements with MS flat 25mm
Providing & Painting of S/S Structures,earth strip & Equipments with red oxide,Green and allumunium paints.
All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project.
Giving proper support, giving Ac supply and making necessary arrangements for Testing of CTs,VBCs,Transformer,after completion of work to departmental Test team.
Decenctralise Material For 11KV line
,e0,l0 gksfYMax DySEi STP
,e0,l0 gksfYMax DySEi PCC
,e0,l0 gksfYMax DySEi Joist
th0vkb0 ckjcsM ok;j
,Q czsdsV
MsUtj cksMZ DySEi lfgr
uV ,oa cksYV
ih0th0 DySEi
,e0,l0 LVs DySEi
,e0,l0 ^bZ&czSdsV^ ¼,e0,l0 fLVªi½
pSuy czsfdV DySEi lfgr
,ywfefu;e iSUV
jSM vkfDlkbM iSUV
,e0,l0 gksfYMax DySEi Vki pSuy gsrq
,e0,l0 gksfYMax DySEi xkfMZax ,afxy gsrq
Cable clamping clamp for over head cable laying/hoisting
bracing clamp
11KV Line work
Shifting, Loading and carriage of Pole, accessories(centralised /decentralised items) from store to site.
carriage of 11 kv cable including all acessories
Erection of poles with fitting of all acesories
Laying / spreading/stringing of 3 phases of ACSR rabbit cond.
Pole number painting with paint.
Concreting (grouting) of poles inratio 1:4:8(cement:sand:40mm brick ballast:)
Plinthing (muffing) of pole.
Concreting of stay set complete.
Cutting of tree branches and disposal of same.
HT connection/ disconnection of 33 kv line.
Gaurding work complete
Laying of 11 KV Cable in air with 6 inch GI pipe including materials,including cable interconnection.
HDD machine charges for digging for laying 11 kv cable D/C
Digging of trench for 11 kv cable laying including cost for bricks and sand etc. D/C
Dismantelling/cutting/welding of all old fittings, conductors,etc of existing pole for the work of double circuiting including work of all new fittings,including work of increasing of pole hieght etc, including collections of scraps and reciept back to store center.The work also includes pole height increasing of existing 33 kv line poles as per required.
Road cutting/ restoration charges or NH crossing of cable
cable jointing charges of 11 kv cable with cj kit
R A ENGINEERS
M/S MUDRAWATI
M/s King Associates
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .