| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.3 L+₹2,363.48 (0.18%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹13.3 L
EMD Value
₹13,400
Closing Date
13 Sept 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer BP
Panchayat Union Vallam
VPM/VALLAM15CFC BP/24-25/Pack-1
2024_RDTN_479956_1
VPM/VALLAM15CFC BP/24-25/Pack-1
Open Tender
Civil Works
Works
VALLAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,400
Yes
24 Sept 2024
2 Sept 2024
13 Sept 2024
2 Sept 2024
13 Sept 2024
2 Sept 2024
Amount
1)Providing Open well For cover weld mesh (3.60 m Dia) And Streening Wall @Near PDS Shop Existing Open well In Perumbugai
Cost and Supply of open well for cover weld mesh and l"angle including conveyance and all labour charges etc.
Weld Mesh
Desilting work excavation for Open well complying with relevent clauses of TNDSS well sinking with initial lead and lift
Open well excavation complying with relevent clauses of T.N.D.S.S. Well sinking and with a lead upto 10 m in Hard granite requiring blasting measured in solid including stackingetc,complete. VI Depth
VII Depth
Random rubble masonry in cement mortar 1:5 mix with simultaneous
Labour charges for fixing Weld mesh for Open well
Provision for Bailing out water charges
Provision for LWF 1%
Provision for Photographic charges
2)PROVIDING NEW BORE WELL 90 M AND 1.5H P MOTOR AND SPL"S AND(1000 lit) RCC TANK@ IN PERUMBUGAI PANCHAYAT
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc,
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.)
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Plastering with CM 1:4-20mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3- 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc.,
Towards cost for Fixing of RCC Man Hole
Provision for New Bore Well And Motor and Spl"s
Provision for EB CHARGES
Labour welfare fund @ 1.0%
Provision for Name board charges
Provision for Photographic charges
3)PROVIDING NEW BORE WELL AND MOTOR AND SPL"S AND RCC TANK@NEAR THERSHING FLOOR IN PERUMBUGAI PANCHAYAT
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc,
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.)
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size 300 mm x 200 m x 6 mm of any shape and quality laid cement mortor 1 : 2 over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete
Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc.,
Towards cost for Fixing of RCC Man Hole
Provision for New Bore Well And Motor and Spl"s
Provision for EB CHARGES
Labour welfare fund @ 1.0%
Provision for Name board charges
Provision for Photographic charges
4)AUGUMENTATION OF EXISTING SOURCES AND PROVIDING RCC TANK (2 NOS)@ANATHUR PANCHAYAT
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc,
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.)
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size 300 mm x 200 m x 6 mm of any shape and quality laid cement mortor 1 : 2 over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete
Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc.,
Towards Labour Charges For Pipe Fixing Work
Towards cost for Fixing of RCC Man Hole
Provision for New Bore Well And Motor and Spl"s
Labour welfare fund @ 1.0%
Provision for Name board charges
Provision for Photographic charges
5)PROVIDING NEW BORE WELL AND MOTOR AND SPL"S AND RCC TANK@IYYANAR KOVIL IN PERUMBUGAI PANCHAYAT
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc,
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.)
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size 300 mm x 200 m x 6 mm of any shape and quality laid cement mortor 1 : 2 over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete
Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc.,
Towards cost for Fixing of RCC Man Hole
Provision for New Bore Well And Motor and Spl"s
Provision for EB CHARGES
Labour welfare fund @ 1.0%
Provision for Name board charges
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Malaiarasan.V (BID ID -1134734)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_570169.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .