Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
21 Oct 2024, 2:00 pmClosed
Superintending Engineer
65/1 Ramamoorthy Road Virudhunagar
Running Works Contract for effecting various works for a period of six months in Sattur section
2024_EB_491301_1
SE/VREDC/AEE/MM/ET no 34, Dt 25.09.2024
Open Tender
Electrical Works
Works
180 days
AEE / T / Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,500
Yes
22 Oct 2024
5 Oct 2024
22 Oct 2024
5 Oct 2024
21 Oct 2024
5 Oct 2024
Amount
Running Works Contract for effecting various works for a period of six months in Sattur section of Sivakasi Division
Loading & Unloading of 7.32m, 7.5m, 8m, 8.23m RCC poles
Loading & Unloading of 9m, 9.14m RCC poles
Loading & Unloading of RS Joists, tubular & rail poles (above 9.14m)
Transporting of poles from road side to Work spot 7.32m, 7.5m, 8m, 8.23m RCC poles/km
Transporting of poles from road side to Work spot9m, 9.14m RCC poles, RS Joists, tubular & rail pole/km
Excavation of pole pit (1.25m * 0.5m*1.5m)in Normal Ground
Erection
Excavation of pole pit (1.25m * 0.5m*1.5m) in Rocky Ground
Erection
Excavation of pole pit (1.25m * 0.6m*1.83m) in Normal Ground
Erection
Excavation of pole pit (1.25m * 0.6m*2.19m) in Normal Ground
Erection
Concreting of poles as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete.
Coping of poles
Coil earthing per pole & pole earthing
Excavation of stay pit (1.00m * 0.5m*1.5m)
Erection
Fixing of V cross arm, Channel cross Arm4 1/2'
Fixing of V cross arm, Channel cross Arm3 1/2'
Fixing of LT Three phase cross arm
Fixing of LT single phase cross arm
Fixing of HT / LT TI fitting
Fixing of Tapping channel cross arm
Erection of HT Side arm with stud
Erection of LT Side arm with stud
Fixing of Guarding Cross Arm
Stringing, Sagging, binding including transporting of materials from road side to site For 7/4.09 ACSR (per span/wire)
Stringing, Sagging, binding including transporting of materials from road side to site For 7/3.35 ACSR or 7/3.15 AAAC
Stringing, Sagging, binding including transporting of materials from road side to site For 7/2.59 ACSR or 7/2.50 AAAC
Resagging of LT & HT. line of all sizes
Spilt Neutral Guarding
Flat Guarding (2 wires)
Flat Guarding (4 wires)
Fixing of one earthing device
Erection/ Dismantling of Transformer Upto 150 KVA
Erection/ Dismantling of Transformer 250 KVA
Erection of centre support for 250 KVA DT (Including concrete)
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Bus bar arrangement with open type
Loading and Unloading of distribution transformer Below 250 KVA
Loading and Unloading of distribution transformer 250 KVA
Loading & Unloading of all sizes of DT using private Crane vehicle
i)Loading /Un loading of Metering Set
ii)Erection / dismantling of Metering Set
Changing of pin point to cut point LT
Changing of pin point to cut point HT
Single Phase service connection
Three Phase service connection
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Dismantling of 7.5Mtr /8Mtr PSC & Pole
Dismantling of 9.14Mtr RCC Pole and above
Dismantling of stay with guy shackle complete
Replacement of detoriated stay rod
Dismantling of 3.5' V cross arm and channel cross arm
Dismantling of 4.5' and 5' V cross arm
Dismantling of TI Fitting
Dismantling of Single phase/ 3 phase cross arm
complete replacement of worn out earth wire per structure
Tree clearance For ordinary trees and thorn bushes and trees
Tree clearance For coconut and Palm trees
Painting structure Pole (Colour washing with emulsion on Labour only) (Double coat)
Painting Transformer structure (Double coat)
For transformer only (Double coat)
Set right of leaning of HT pole / LT pole including X arms, TI fittings
Excavation of structure pole pits 2Nos
Erection of structure poles 2Nos
Transformer structure pole mass concrete (All materials including cement (Ratio 1:2:4) and coping
Top channel
Transformer seating channel and belting angle
AB switch (complete)
HG Fuse (complete)
Jumpering
HT LAS
LT LAS
Fixing of capacitor bank in Distribution Transformer with wiring irrespective of capacitor
Excavation of 3 Nos. earth pits
Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
Mason works for earth pits including material
Spreading yard jelly and cut stone and bricks including materials
9 mtr long RCC Pole (Square Section) complete
Maintenance of A/B switch
Maintenance of Single Pole Distribution Transformer and Structure complete
Replacement of GI wire in LT cut points replaced with Lt metal parts
Replacement of worn out AB Switch knife, checking of alignment and lubrication
Attending H.T jumper cut
Attending L.T jumper cut
Replacement of H.T Disc
Replacement of HT Pin insulator
Replacement of L.T shackle with metal parts
Replacement of L.T pin insulator
Maintenance of DP Structure complete
ப jumper provision ( including of service wire disconnection & reconnection)
Set right of Tilted X arm
stage.html
html • 0.02 MB
finance_583692.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .