Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical S 511 A S 511 B SHOP NO 202 A 2ND FLOOR SCHOOL BLOCK SHAKARPUR EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
27 Mar 2026, 2:00 pmClosed
PANKAJ KUMAR
GAIL GAS LIMITED
HIRING OF CONTRACT SERVICES FOR LAST MILE CONNECTIVITY WORKS AT RAISEN_SEHORE_SHAJAPUR GA
2026_GAILG_264567_1
GAIL GAS/NOIDA/PK/4264/25-26/98
Open Tender
Miscellaneous Works
Percentage
210 days
Noida
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.3 L
Yes
Through VC
30 Jul 2026
27 Feb 2026
30 Mar 2026
27 Feb 2026
27 Mar 2026
6 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | RSS | - | - | - | - |
| 2 | PE PIPELINE | - | - | - | - |
| 3 | Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/Hard surface/Pebbles/Cobbles/Boulders/ Structures/Rock surface etc using open cut/ Moling (without Casing)/ Moling (with Casing)/Directional Drilling technique (with and without casing pipe) methodology. | - | - | - | - |
| 4 | Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 32 mm), Warning Mat etc.
Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs.
In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.
-Laying of all PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) , Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification).
-Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.
-Casing details is as given below:-
1. For 20/32 mm PE pipe (in 75 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).
2. For 63 mm PE pipe (in 125 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).
3. For 90 mm pipe (in 180 mm dia. HDPE Casing Pipe, PE 63/80 PN6.0).
4. For 125 mm pipe (in 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0). | - | - | - | - |
| 5 | Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings. | - | - | - | - |
| 6 | Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: | - | - | - | - |
| 7 | Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval. | - | - | - | - |
| 8 | Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc. | - | - | - | - |
| 9 | Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. | - | - | - | - |
| 10 | Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. | - | - | - | - |
stage.html
html • 0.04 MB
cancelled_1.pdf
pdf • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tender_Vol_IRSS.pdf
Tender Documents • 3.66 MB
Tender_Vol_II.pdf
Tender Documents • 8.61 MB
BOQ_312767.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .