| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹42.7 LAccepted-AOC 3 147 KPN NAGAR MELTUR DAM 636 401 | SALEM | TAMIL NADU | 636401 | ₹42.7 L Quoted ₹37.6 L | 1 | Accepted-AOC L1 |
| 2 | 2₹38.1 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹38.1 L | 2 | Rejected-AOC L2 |
| 3 | 3₹56.4 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹56.4 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | K.DHANASEKARAN ENGG. CONTRACTOR L1 | R RAMACHANDRAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for Removal of insulation wool mattress and applying new/ same wool mattress after cutting to the required contour shape for 1 layer | 1,400 | m2 | 323 ₹4.5 L | 321.75 ₹4.5 L | 482 ₹6.7 L |
| 2.00 | Charges for Removal of deteriorated G.I sheets and fixing the new/ same G.I. sheets after making grooves and tightening with lock screws (1/4”) | 1,400 | m2 | 343 ₹4.8 L | 340.65 ₹4.8 L | 516 ₹7.2 L |
| 3.00 | Charges for Removing the GI strips and retainer plates and providing back with new/ same strips and retainer plates. | 1,400 | m2 | 92 ₹1.3 L | 91.4 ₹1.3 L | 136 ₹1.9 L |
| 4.00 | Charges for Cleaning of released wool from work spot: This work involves complete collection of released waste wool, debris and unwanted insulation materials from the work spot gathered in one place and clear transport for away from the site. | 750 | m2 | 118 ₹88,500 | 116.25 ₹87,187.50 | 176 ₹1.3 L |
| 5.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 8 | Times | 13,060 ₹1.0 L | 13,002.65 ₹1.0 L | 19,701 ₹1.6 L |
| 6.00 | Erection of MS Mesh size : 6mmx100mmx100mm. Work involves supply with erecting and welding of MS Mesh 6x100x100mm at Flue Gas duct | 320 | m2 | 426 ₹1.4 L | 419 ₹1.3 L | 621 ₹2.0 L |
| 7.00 | Insulation materials for 1Sq.m : Insulation Wool of size 60 mm thick. Density :150 Kg /m3 as per IS:8183:1993. G.I.Sheet 0.60mm thick with 120gm/sq.m of Galvanizing coating, ClassVIII as per IS 277, M.S.PinSize 6mm dia x 225mm, Retainer:70x2mm, GIcasing support of size :65x650mm. | 1,400 | m2 | 1,720 ₹24.1 L | 1,695 ₹23.7 L | 2,538 ₹35.5 L |
| 8.00 | Consumables and T&Ps for item S.no.1 to 6 | 1 | LS | 8,320 ₹8,320 | 8,317 ₹8,317 | 9,000 ₹9,000 |
Tender Value
Refer Docs
EMD Value
₹34,500
Closing Date
30 Sept 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit II Removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the Portion in ESP outlet common FG duct area ID fan 2B outlet FG duct horizontal vertical portion and ID fans casing area etc
2024_EB_484560_1
CE / MTPS-I / SE / M-I / BM /OT.160 / 2024-25
Open Tender
Power/Energy Projects/Products
60 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹34,500
Yes
19 May 2026
16 Sept 2024
1 Oct 2024
16 Sept 2024
30 Sept 2024
16 Sept 2024
Amount
Charges for Removal of insulation wool mattress and applying new/ same wool mattress after cutting to the required contour shape for 1 layer
Charges for Removal of deteriorated G.I sheets and fixing the new/ same G.I. sheets after making grooves and tightening with lock screws (1/4”)
Charges for Removing the GI strips and retainer plates and providing back with new/ same strips and retainer plates.
Charges for Cleaning of released wool from work spot: This work involves complete collection of released waste wool, debris and unwanted insulation materials from the work spot gathered in one place and clear transport for away from the site.
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Erection of MS Mesh size : 6mmx100mmx100mm. Work involves supply with erecting and welding of MS Mesh 6x100x100mm at Flue Gas duct
Insulation materials for 1Sq.m : Insulation Wool of size 60 mm thick. Density :150 Kg /m3 as per IS:8183:1993. G.I.Sheet 0.60mm thick with 120gm/sq.m of Galvanizing coating, ClassVIII as per IS 277, M.S.PinSize 6mm dia x 225mm, Retainer:70x2mm, GIcasing support of size :65x650mm.
Consumables and T&Ps for item S.no.1 to 6
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1143511)
R RAMACHANDRAN (BID ID -1151519)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_575806.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid