Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹18.9 LAccepted-Finance | 1st | Accepted-Finance Accepted | |
| 2 | 2nd₹19.0 L+₹11,697.70 (0.62%)Accepted-Finance | 2nd | Accepted-Finance Accepted | |
| 3 | 3rd₹19.2 L+₹31,130.15 (1.65%)Accepted-Finance | 3rd | Accepted-Finance Accepted | |
| 4 | 4th₹21.1 L+₹2.2 L (11.5%)Accepted-Finance DOMKHAR | 4th | Accepted-Finance Accepted | |
| 5 | Not Admitted-Fee/PreQual/Technical R O SKINDIYANG | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹38,800
Closing Date
1 Jan 2022, 4:00 pmClosed
Executive Engineer I and F C Division Leh
Office of the Executive Engineer I and F C Division Leh
Strengthening of Irrigation Canal upper Domkhar Wal.(Under District Plan)
2021_PWD_5434_1
73 Iand FC Division Leh 2021-22
Open Tender
Civil Works - Others
Item Rate
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer I and F C Division Leh
₹38,800
28 Jan 2022
11 Dec 2021
4 Jan 2022
12 Dec 2021
1 Jan 2022
12 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil
Hard Rock (Required Blasting)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of cement.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) including carriage of Cement.
Dumping of Stone excluding cost of Stone on Horizontal on level.
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded
Carriage of Material by Mechanical Transport including loading unloading comlplete job. Sand for an avg.lead of 35 km
Stone agg.for an avg.lead of 35 km
Carriage of Material by Manual Labour comlplete job. Cement for an avg.lead of 700 Mtr
Sand for an avg.lead of 700 mtr
Stone agg.for an avg.lead of 700 mtr
Soiling Stone for an avg.lead of 700 mtr
M/S TASHI GYALCHAN
M/S STANZIN MOTUP GOVT CONTRACTOR
M/S LOBZANG STANBA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .