Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC 112 KHUDIRAM BOSE SARANI BELGACHIA KOLKATA 700004 | KOLKATA | KOLKATA | WEST BENGAL | 700004 | ₹16.2 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹16.2 L+₹1,580.24 (0.10%)Rejected-AOC | ₹16.2 L+₹1,580.24 (0.10%) | L2 | Rejected-AOC Greater than Lowest Bidder |
| 3 | L3₹16.2 L+₹4,740.71 (0.29%)Rejected-Finance 5743 BAGUINARA ROAD BURIBATTALA SUBHASGRAM SOUTH 24 PARGANA KOLKATA 700147 | KOLKATA | SOUTH 24 PARGANA | WEST BENGAL | 700147 | ₹16.2 L+₹4,740.71 (0.29%) | L3 | Rejected-Finance Greater than 2nd Lowest Bidder |
Tender Value
₹15.8 L
EMD Value
₹31,605
Closing Date
5 Mar 2026, 11:00 amClosed
EEKNIID
82 BELGACHIA ROAD KOLKATA-37
AS PER NIT
2026_HSD_998584_2
WBHOUSING/EE/KN2D/NIT13/25-26
Open Tender
CIVIL WORKS
Percentage
45 days
KOLKATA
REFER TO TENDER DOCUMENTS
5 documents required · 5 mandatory
₹31,605
Yes
82 BELGACHIA ROAD KOLKATA37
7 Jul 2026
9 Feb 2026
9 Mar 2026
9 Feb 2026
5 Mar 2026
16 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars
Ground Floor | - | Cu.m. | - | - |
| 2 | 1st Floor | 7.5 | Cu.m. | - | - |
| 3 | 2nd Floor | 7.5 | Cu.m. | - | - |
| 4 | 3rd Floor | - | Cu.m. | - | - |
| 5 | Cutting chase upto 125 x 150 mm. and subsequent
mending of damages.
(a) in brick wall [Cement-3.6 Kg/Mtr] | - | Mtr. | - | - |
| 6 | (b) in concrete wall [Cement-3.6 Kg/Mtr] | 1 | Mtr. | 112 | ₹111.89 |
| 7 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
Ground Floor | 5.1 | Cu.m. | 447 | ₹2,279.7 |
| 8 | 1st Floor | 5.1 | Cu.m. | - | - |
| 9 | 2nd Floor. | 5.1 | Cu.m. | - | - |
| 10 | 3rd Floor | 5.1 | Cu.m. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_2455369.xls
BOQ • 0.31 MB
2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .