Loading…
Loading…
Tender Value
₹13.2 L
EMD Value
₹27,000
Closing Date
5 Jul 2026, 3:01 pmClosed
Vinay Kumar
Executive Officer
Nagar Panchayat Jagdishpur
Vinay Kumar
Executive Officer
WARD NO-18 ME MUNNI DEVI KE MAKAN SE BANGALI POKHAR TAK PCC EVAM NALI NIRMAN KARYA
134619
NIT- 01/2026-27 GR-40 NAGAR PARISHAD SHEIKHPURA
Open Tender
CIVIL
Sheikhpura
• PAN DETAILS
• DEPARTMENT REGISTRATION DETAILS
• GST REGISTRACTION DETAILS
• AFFIDAVIT AS PER NIT
(ATTACHED OR NOT)
• and other as per nit clause nessery
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹2,500
Processing Fee: 590
₹27,000
OFFICE OF NAGAR PARISHAD SHEIKHPURA
23 Jun 2026
23 Jun 2026
6 Jul 2026
24 Jun 2026
5 Jul 2026
24 Jun 2026
25 Jun 2026
BILL OF QUANTITY
वार्ड न0 18 में मुन्नी देवी से बंगाली पोखर तक एवं विवेकानंद से रुपक स्टूडियो तक पथ एवं नाली निर्माण कार्य
THE RATES OF ITEMS ARE BASED ON CURRENT S.O.R. OF BUILDING CONSTRUCTION DEPARTEMENT -2022, GOVT. OF BIHAR .
S.NO. ITEM NO. ITEM OF WORK QUANTITY RATE UNIT AMOUNT
1.00 2.8 BCD Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 114.70 360.70 CUM 41372.29
2.00 15.2.1 BCD Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish lead upto 50 m and lift upto 1.5 m 167.29 1355.40 CUM 2267.45
3.00 2.28 BCD Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. 38.11 287.30 CUM 10949.00
4.00 11.72 BCD Providing designation 100 A one brick flat soling joints filled with local sqm 283.30 sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, 292.75 283.30 SQM 82936.08
5.00 4.1.1 BCD Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level. 38.11 4420.10 CUM 168450.01
1:1.5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
6.00 5.1.2 BCD (RCC)Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring,shuttering,finishing and reinforcement-All work puto plinth level 16.89 5214.10 CUM 88066.15
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
7.00 5.22.7A 5.22.B Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
8.00 5.9.1 Centring and shuttering including strutting,propping etc. and removal of form for. 177.74 211.60 SQM 37609.78
9 6.1.12A Bick work with bricks of class designation 100A in foundation and plinth in : Cement Mortar 1:4(1Cement :4C sand) 31.73 5017.90 CUM 159217.97
10 13.17.2 12mm cement plaster of mix:1:4(1 cement:4 coarse sand)Neat cement punning 181.09 182.00 SQM 32958.38
11.00 2.26 BCD BANKING EXCAVTED EARTH excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering lead 50.98 364.40 CUM 18577.11
10.00 CARRIAGE OF MATERIAL
B COARSE SAND- 42.08 1143.25 CUM 48107.96
C LOCAL SAND - 43.37 316.15 CUM 13711.43
D STONE CHIPS- 46.28 493.08 CUM 22819.74
Add extra Cost of material:-
Seigniorage fee(10%)
A Local sand 43.37 14.19 M³ 615.42
B Coarse sand 42.08 17.58 M³ 739.77
C Stone chips 46.28 55.63 M³ 2574.70
12.00 ADD COST SIGNBOARD AND PHOTO 3500.00
11.00 CIVIL WORK COST 909333.81
Add extra cost of GST 6% 54560.03
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
all document.pdf
NIT • 3.34 MB
New Doc 06-23-2026 13.43.pdf
NIT • 3.53 MB
all document.pdf
NIT • 3.34 MB
New Doc 06-23-2026 13.43.pdf
NIT • 3.53 MB
GR 40.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .