Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC IST RANK |
| 2 | L2₹1.2 CrRejected-AOC GURDASPUR | GURDASPUR | PUNJAB | 143505 | ₹1.2 Cr | L2 | Rejected-AOC 2ND RANK |
| Sl No | Description | Qty | Unit | THE NAUSHERA MAJHA SINGH CORP LABOUR AND CONSTRUCTION SOCIETY LIMITED L2 | SEEMAX AGGREGATE AND CONCRETE L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods (Cutting) | 43.59 | cum | 90 ₹3,923.10 | 81 ₹3,530.79 |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.( Filling) | 3,887.09 | cum | 119 ₹4.6 L | 115 ₹4.5 L |
| 3.00 | Dressing of New Earthwork | 11,306.95 | sqm | 2 ₹22,613.90 | 1.5 ₹16,960.43 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 272.37 | cum | 160 ₹43,579.20 | 151 ₹41,127.87 |
| 5.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 9.59 | km | 900 ₹8,631 | 810 ₹7,767.90 |
| 6.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 5,315.35 | sqm | 14 ₹74,414.90 | 12 ₹63,784.20 |
| 7.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls | 1,482.08 | cum | 6,650 ₹98.6 L | 6,555 ₹97.2 L |
| 8.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 4,745.42 | sqm | 190 ₹9.0 L | 180 ₹8.5 L |
| 9.00 | 10 mm thick Cement Plaster 1:4 on Floors | 5,232.77 | sqm | 150 ₹7.8 L | 145 ₹7.6 L |
| 10.00 | Providing & Laying Brick Bats | 8.46 | cum | 1,200 ₹10,152 | 1,006 ₹8,510.76 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
28 Feb 2026, 12:00 pmClosed
Xen Gurdaspur UBDC
Executive Engineer Gurdaspur Canal and Ground Water Division WRD,Punjab
Estimate for Construction of Water Course at Outlet RD 25489/L of Nanonanagal Distributary under jurisdiction of Tibri Sub Division
2026_WR_157264_2
48/110A
Open Tender
Civil Works - Canal
90 days
GURDASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹2.2 L
11 Mar 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods (Cutting)
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.( Filling)
Dressing of New Earthwork
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Dag belling single kassi stroke minimum 7.5 cm depth.
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
Providing & Laying Brick Bats
Supplying of Steel Shutter with One Extra Frame for Nakka and Branch Offtakes
Fixing of Shutter and Frames for Nakka and Branch Offtakes
Providing,Lowering,jointing & Cutting of RCC pipes 500mm dia into trenches & laying same to correct alignment
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_327844.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid