| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAdmitted-Finance | ₹6.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.7 Cr+₹19.3 L (2.99%)Admitted-Finance | ₹6.7 Cr+₹19.3 L (2.99%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Finance VPO THANA TEHSIL NURPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 176001 | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | KUMAR ASSOCIATES L1 | YOG RAJ SHARMA L2 |
|---|---|---|---|---|---|
| 1.00SUB HEAD:- EARTH WORK | |||||
| 1.01Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 1.02 | All kinds of soil | 963 | Cum | 150 ₹1,44,450 Lowest | 150 ₹1,44,450 Lowest |
| 1.03Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. | |||||
| 1.04 | Ordinary rock | 241 | Cum | 300 ₹72,300 Lowest | 350 ₹84,350 |
| 1.05Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.06 | All kinds of soil. | 32 | Cum | 160 ₹5,120 | 150 ₹4,800 Lowest |
| 1.07Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. | |||||
| 1.08 | Ordinary rock | 8 | Cum | 320 ₹2,560 Lowest | 350 ₹2,800 |
| 1.09Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : | |||||
Tender Value
₹8.6 Cr
EMD Value
₹17.1 L
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer (C)
Executive Engineer (C)BSNL CIVIL DIVISION SUNDER NAGAR
Construction of 100 bedded Girls Hostel at NSCB Memorial Degree College Hamirpur Distt Hamirpur HP Sub Head Civil and Electrical Work
2026_BSNL_288921_1
13/EE/BSNL/CD/SNR/2026-27
Open Tender
Civil Works - Buildings
Item Rate
480 days
HP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Accounts Officer EF O/o CGMT BSNL HP Telecom C
₹17.1 L
17 Sept 2026
27 Aug 2026
11 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SUB HEAD:- EARTH WORK | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | - | - | - | - |
| 1.02 | All kinds of soil | 963 | Cum | 177.5 | ₹1,70,932.5 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. | - | - | - | - |
| 1.04 | Ordinary rock | 241 | Cum | 498.9 | ₹1,20,234.9 |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 1.06 | All kinds of soil. | 32 | Cum | 260.3 | ₹8,329.6 |
| 1.07 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. | - | - | - | - |
| 1.08 | Ordinary rock | 8 | Cum | 632.95 | ₹5,063.6 |
| 1.09 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.17 MB
BOQ_337005.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .