Loading…
Loading…
Tender Value
₹18.7 Cr
EMD Value
₹18.7 L
Closing Date
28 Sept 2026, 5:00 pm
Chief Engineer, Bridges, Odisha
Nirman Soudha, O/o EIC (Civil), Odisha, Bhubaneswar
Improvement of such as widening and strengthening of Rambha Khandadeuli road from 0.0 to 10.992km in the District of Ganjam for the year 2026-27
2026_EICCL_138040_1
CE-BRIDGES-08/ 2026-27
Open Tender
Civil Works - Roads
Percentage
365 days
in the District of Ganjam
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹18.7 L
Yes
19 Aug 2026
19 Aug 2026
29 Sept 2026
19 Aug 2026
28 Sept 2026
19 Aug 2026
19 Aug 2026 - 29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 99,340.19 | Sqm | 8.63 | ₹8,57,305.84 |
| 2 | Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 186.07 | Cum | 662.19 | ₹1,23,213.69 |
| 3 | Dismantling of Prestressed /Reinforced cement concrete grade M-20 & above including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.. | 8 | Cum | 1,830.38 | ₹14,643.04 |
| 4 | Removing of hume pipe above 600 mm dia including earthwork and dismantling of masonry works including T&P and scaffolding whenever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 25 | Rmt | 297.81 | ₹7,445.25 |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m in all respect as per approved drawing and Technical Sepction as per Section 900 and Clause 301 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direciton of Engineer-in-Charge. | 36,820.41 | Cum | 74.85 | ₹27,56,007.69 |
| 6 | Loosening, leveling and compacting original ground supporting embankment to facilitate placement of 1st layer of emankment, scarified to a depth of 150mm mixed with water at OMC and then compacted by rolling so as to achive minimum dry density given in the table 300.2 for embankment construction as per approved drawing andtechnical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 13,724.06 | Cum | 36.08 | ₹4,95,164.08 |
| 7 | Scarifying and removing existing Bituminous surface to the required depth and disposal of scarified material within all lifts and lead upto 1000metres, as per clause No. 305.4.3, 305.8, 305.9.6, 501.8.3.2, 501.8.7.2, 501.8.8.1 and Section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, taxes, royalty etc. complete in all respect and as per direction of the Engineer-in-charge. | 60,016 | Sqm | 6.06 | ₹3,63,696.96 |
| 8 | Reworking and compacting the scarified surface with Stone screened Dust passing through 2.36 mm sieve and retained on 0.075 mm sieve to line and level as per Clause 501.8.3.2 of MoRT&H Specifications for Road & Bridge works (4th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 60,016 | Sqm | 15.8 | ₹9,48,252.8 |
| 9 | Construction of embankment with approved materials deposited at site from road-way cutting excavation from drain and foundation other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 27,698.72 | Cum | 35.86 | ₹9,93,276.1 |
| 10 | Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 38,045.99 | Cum | 203.91 | ₹77,57,957.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
DTCN_RAMBHA.pdf
Tender Documents • 1.15 MB
BOQ_606223.xls
BOQ • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].