Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹37.1 L (17.1%)Admitted-Finance | ₹2.5 Cr+₹37.1 L (17.1%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 Cr+₹73.5 L (33.8%)Admitted-Finance | ₹2.9 Cr+₹73.5 L (33.8%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹80.1 L (36.9%)Admitted-Finance | ₹3.0 Cr+₹80.1 L (36.9%) | L4 | Admitted-Finance |
| 5 | L5₹3.2 Cr+₹99.9 L (46.0%)Admitted-Finance RH1 2 PLOT NO 5 SECT 3 SHREE NITHYANAND CHS NEW PANVEL E NAVI MUMBAI 410206 MAHARASHTRA INDIA | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | ₹3.2 Cr+₹99.9 L (46.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L2 | A.A.Auctioneers And Contractors Pvt.Ltd L7 | Vichitra Constructions Pvt Ltd L8 | ONIX ENCLAVES PVT LTD L6 | MAS CONSTRUCTIONS L5 | SHREE CHAMUNDA CONSTRUCTION L4 | Trije Engineers L1 | ANERI CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CROSSINGS/LAYING ALONG THE ROAD BY HDD METHOD | |||||||||||
| 2.00Complete work of pipeline crossing by Horizontal Directional Drilling (HDD) method, within the limits as defined in approved drawings, including engineering, surveys, approvals, execution, testing, and commissioning, in accordance with Contract Documents, applicable codes, specifications, and instructions of the Engineer-in-Charge. | |||||||||||
| 3.00Transportation & Handling Receiving and taking over Owner-supplied three-layer PE coated line pipes from Owner’s designated storage/issue point and transportation to Contractor’s stockyard/workshop/worksite, including all loading, unloading, handling, stacking, shifting, alignment, and safe storage. | |||||||||||
| 4.00Engineering, Surveys & Approvals Detailed pre-construction surveys based on site visits Collection of historical and utility data from concerned authorities. Design calculations, profile design, stress analysis, minimum cover calculations as per applicable codes Detailed engineering and preparation of HDD crossing drawings Submission of drawings, calculations, and methodology for approval of Owner / Engineer-in-Charge / concerned statutory authorities Obtaining any NOC and utility crossing clearances prior to commencement of work | |||||||||||
| 5.00Mobilization Mobilization of all manpower, HDD rigs, equipment, tools, consumables, machinery, utilities, temporary facilities, and acquisition of land (if required) for storage, fabrication, and execution. | |||||||||||
| 6.00Pipe String Preparation Stringing and preparation of pipes Welding including welding repairs Radiography / NDT and retesting Field joint coating using special type Heat Shrink Sleeve (Dirax or equivalent) Coating repairs using PERP-80 or equivalent approved repair materials Pre-hydrotesting of complete pipe strings prepared for HDD crossing | |||||||||||
| 7.00HDD Execution Pilot drilling to the approved alignment and depth Reaming (one or multiple stages as required) to achieve the required bore diameter Maintaining bore stability in all soil/rock strata encountered Pulling / installation of pipeline string through HDD bore using approved methods Ensuring minimum cover as per codes/specifications or as decided by the concerned authority, whichever is more | |||||||||||
| 8.00Testing Post-installation hydrotesting of HDD section, including dewatering Pigging, cleaning, gauging, and final hydrotesting in coordination with mainline works Tie-in welding with adjacent pipeline sections and associated testing | |||||||||||
| 9.00Restoration & Clean-Up Backfilling of entry/exit pits, restoration of road/ground, disposal of waste materials, and complete site clean-up to the satisfaction of the Engineer-in-Charge and concerned authorities. | |||||||||||
| 10.00 | Laying of carrier pipeline of size 250 (approx.) mm NB x 6.4 mm thk. of API 5L Gr. B (along with laying of 4'' Steel Pipe for MDPE) by HDD Method . | 560 | Meter | 38,499 ₹2,54,40,139.2 | 79,999 ₹4,47,99,440 | 75,000 ₹4,95,60,000 | 65,000 ₹4,29,52,000 | 48,000 ₹3,17,18,400 | 45,000 ₹2,97,36,000 | 38,799 ₹2,17,27,440 Lowest | 44,000 ₹2,90,75,200 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
27 Jan 2026, 3:00 pmClosed
GM C and P
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune - 411045
Tender for HDD Work from Amarjai Mata Mandir to Near Hotel Shiv Pure Veg (Approx. 560 m) under Alegaon Loop Line Project in Pune GA
2026_MNGL_263613_1
MNGL/CP/2025-26/128
Open Tender
Miscellaneous Works
Works
60 days
Pune
As per tender
16 documents required · 16 mandatory
₹0
₹2 L
Yes
Online
13 Feb 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
22 Jan 2026
CROSSINGS/LAYING ALONG THE ROAD BY HDD METHOD
Complete work of pipeline crossing by Horizontal Directional Drilling (HDD) method, within the limits as defined in approved drawings, including engineering, surveys, approvals, execution, testing, and commissioning, in accordance with Contract Documents, applicable codes, specifications, and instructions of the Engineer-in-Charge.
Transportation & Handling Receiving and taking over Owner-supplied three-layer PE coated line pipes from Owner’s designated storage/issue point and transportation to Contractor’s stockyard/workshop/worksite, including all loading, unloading, handling, stacking, shifting, alignment, and safe storage.
Engineering, Surveys & Approvals Detailed pre-construction surveys based on site visits Collection of historical and utility data from concerned authorities. Design calculations, profile design, stress analysis, minimum cover calculations as per applicable codes Detailed engineering and preparation of HDD crossing drawings Submission of drawings, calculations, and methodology for approval of Owner / Engineer-in-Charge / concerned statutory authorities Obtaining any NOC and utility crossing clearances prior to commencement of work
Mobilization Mobilization of all manpower, HDD rigs, equipment, tools, consumables, machinery, utilities, temporary facilities, and acquisition of land (if required) for storage, fabrication, and execution.
Pipe String Preparation Stringing and preparation of pipes Welding including welding repairs Radiography / NDT and retesting Field joint coating using special type Heat Shrink Sleeve (Dirax or equivalent) Coating repairs using PERP-80 or equivalent approved repair materials Pre-hydrotesting of complete pipe strings prepared for HDD crossing
HDD Execution Pilot drilling to the approved alignment and depth Reaming (one or multiple stages as required) to achieve the required bore diameter Maintaining bore stability in all soil/rock strata encountered Pulling / installation of pipeline string through HDD bore using approved methods Ensuring minimum cover as per codes/specifications or as decided by the concerned authority, whichever is more
Testing Post-installation hydrotesting of HDD section, including dewatering Pigging, cleaning, gauging, and final hydrotesting in coordination with mainline works Tie-in welding with adjacent pipeline sections and associated testing
Restoration & Clean-Up Backfilling of entry/exit pits, restoration of road/ground, disposal of waste materials, and complete site clean-up to the satisfaction of the Engineer-in-Charge and concerned authorities.
Laying of carrier pipeline of size 250 (approx.) mm NB x 6.4 mm thk. of API 5L Gr. B (along with laying of 4'' Steel Pipe for MDPE) by HDD Method .
Note: (i) Crossing width and actual HDD string length shall vary based on approved design calculations and site conditions to ensure stresses are within permissible limits as per codes/specifications. Final string length and depth of cover shall be approved by the concerned authority / Engineer-in-Charge.
(ii)Payment shall be made on the actual length of pipeline laid by HDD, measured between approved tie-in joints.
(iii) Rates are inclusive of transportation, mobilization, engineering, approvals, string preparation, welding, NDT, pre-testing, HDD execution (pilot drilling, reaming, pulling), coating, post-hydrotesting, restoration, and all incidental activities required for successful completion of the HDD crossing including Post-hydrotesting.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
VolumeII.pdf
Tender Documents • 3.45 MB
Tender_VolumeI.pdf
Tender Documents • 2.45 MB
VolIII.pdf
Tender Documents • 0.01 MB
BOQ_305767.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .