Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
24 Sept 2026, 12:00 pm4d left
Er. Chander Shekhar
Office of the Executive Engineer, Electrical Division No. 3 Sector-4, Chandigarh.
MTC. OF EI IN NRB AT CHANDIGARH (COMPREHENSIVE ANNUAL MTC. OF ONLINE UNINTERRUPTED POWER SUPPLY UNITS INSTALLED AT VARIOUS LOCATIONS IN HONBLE PUNJAB AND HARYANA HIGH COURT, SECTOR-1, CHANDIGARH (FOR THE YEAR 2026-27).
2026_CHD_95530_1
E3/47W/139
Open Tender
Electrical Works
Percentage
365 days
Chandigarh
as per NIT
2 documents required · 2 mandatory
₹0
₹4,000
17 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing AMC for 5KVA (3Ph I/P-3Ph O/P) IGBT Online UPS with Isolation transformer with following specifications | |||||
| 1.01 | Capacity 5KVA IGBT , isolation Tx, UPS, 60 min battery Backup.
AC I/P 3Ph, 415V -20/+15%
frequency 50HZ +/-10%
O/P Voltage 415V AC three phase, 50HZ +/-0.01% (crystal controlled)
Wave form Sinewave
Harmonic Distortion Less than 3%
Efficiency >93% for 192DC
Power Factor 0.8lagging
overload 110% for 10 minute, 200% for 5cycle
Crest factor >4:1
Transient recovery Within 3 cycle
protection a)battery over load b) Battery under voltage,
c) O/P AC over voltage d) O/P over load/ short circuit
Indication Mains on, Load on battery, Battery low, inverter overload, load on mains,
Battery boost, battery level graph, load level graph,
Metering Digital metering
Ambient condition 0 degree C to 50 degree C, 95% RH
Make: Uniline
QTY 1 No. | 1 | Each P.Month | 2,560 | ₹2,560 |
| 2Providing AMC for 10KVA (3Ph I/P-3Ph O/P) IGBT Online UPS with Isolation transformer with following specifications. | |||||
| 2.01 | Capacity 10KVA IGBT , isolation Tx, UPS, 60 min battery Backup.
AC I/P 3Ph, 415V -20% + 15%
frequency 50HZ +/-10%
O/P Voltage 415V AC three phase, 50HZ +/-0.01% (crystal controlled)
Wave form Sinewave
Harmonic Distortion Less than 3%
Efficiency >93% for 192DC
Power Factor 0.8lagging
overload 110% for 10 minute, 200% for 5cycle
Crest factor >4:1
Transient recovery Within 3 cycle
protection a)battery over load b) Battery under voltage,
c) O/P AC over voltage d) O/P over load/ short circuit
Indication Mains on, Load on battery, Battery low, inverter overload, load on mains,
Battery boost, battery level graph, load level graph,
Metering Digital metering
Ambient condition 0 degree C to 50 degree C, 95% RH
Make: Uniline
QTY 4 Nos. | 1 | Each P.Month | 13,815 | ₹13,815 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 22.46 MB
BOQ_117344.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .