Tender ID
Tender Value
₹7.5 Cr
EMD Value
₹3.7 L
Closing Date
3 Feb 2026, 3:30 pmClosed
Chief Municipal Officer
Office Of The Municipal Council Pasan, Distt.-Anuppur (M.P.)
Interception and Diversion of Nallahs with STP works Project of Pasan town under SBM 2.0
2026_UAD_475436_2
80/etender/Pasan/LWM/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Lump-sum
365 days
Muniicipal Council Pasan
Please refer Tender documents.
7 documents required · 7 mandatory
₹20,000
₹3.7 L
Muniicipal Council Pasan
27 Jan 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
30 Jan 2026
1. Design and build sewage treatment plant of installed capacity 1.75 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.69 Km length including survey, design, construction of Required Pumping stations and all appurtenant structures and allied works; and 3. Providing, laying, jointing, testing, commissioning of (i) Sewage Gravity main of RCC NP-3 pipe having length of 100 m of dia 800 mm (ii) Treated water pumping main of DI K-7 pipe having length of 105 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. 4. Providing 1690 m RCC drain 5. Construction of 1No. I&D structures including trash trap 6. Treated Water Sump with Pump House 7. Providing, Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipment’s and fittings complete in all respect
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_562314.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .