| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.7 LAccepted-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹41.7 L+₹4,748.60 (0.11%)Rejected-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹41.8 L+₹9,952 (0.24%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
15 Jul 2025, 6:00 pmClosed
Executive Engineer, BMD, PHED
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102
Operation, and Guarding of Intermediate Boosting pumping station(IBS) and sub-station equipments at Upargora under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte
2025_PHED_866555_23
WBPHED/EE/BMD/NIeT-7 OF 2025-2026
Open Tender
MECHANICAL
Item Rate
365 days
Bankura
Please refer Tender documents.
6 documents required · 6 mandatory
₹86,000
Yes
20 Aug 2025
30 Jun 2025
18 Jul 2025
30 Jun 2025
15 Jul 2025
30 Jun 2025
Amount
PUMPING MACHINERIS Operation, guarding of 4 Nos. (2W + 2S) each having motor capacity of 575 KW (H.T) HC Pumping machinery (Booshting pump), 2nos- Dewatering pumps, H.T & L.T. PDB panel cum MCC panels (Booshting pump) individual motor controll Soft starter panels, electrical gadgets, all valves, flow meters, level indicators etc. and 45KVA D.G set an inside the booshting pumping station and internal and external illumination complete with all other electrical accessories and ancilliaries for supply of water by engaging 4(Four) nos operating personnel round the clock as per direction of E.I.C
GASEOUS CHLORINATION PLANT Operation & guarding of gaseous chlorination system two(2) Set installed at site for feeding chlorine gas in the drinking water for disinfection of the same by engaging 2(Two) nos operating personnel as per direction of E.I.C (by Dep’t.supplied Chlorine Gas )
Routine and periodical maintenance of pumps, motors, valves with actuators, tightening of nut bolt of sluice valve, air valve, dismantling joint etc. including replacements of indicating lamp with holder, replacement of gland packing for pumps and sluice valves with proper lubrication of motor bearings etc. as per direction of E.I.C.
SUB-STATION Operation & Guarding of outdoor Sub-Station i) 11/6.6. KV 2000 KVA Transformer x 2nos. and ii) 11/0.433. (125KV Transformer x 2nos.) with Sub-Station equipment’s and other allied accessories including operation of HV Panel Boards, Control Panel Board, Capacitor Banks, 110 Volt DC trip circuit with maintenance of batteries, battery charger etc. also operation of LV panel board for lighting arrangement by suitable operating personnel as per direction of E.I.C.
ESIC Contribution of Empleyers for SL No-(1,3,5)
EPF Contribution of Empleyers for SL No-(1,3,5)
Cost of refilling of 900kg empty cylenders from authorised liquid chlorine refilling station including charges of testing of cylenders, transpotation etc all complete as per technical Specifications given in NIT
Routine and periodical maintenance of PDB panel board, VCB Panel cables, capacitors, transformer, battery with battery charger, CT & PTs earthing system all breakers, tightening nuts & bolts of bus bar, replacement of control fuses, indicating lamp with holder etc. as per direction of E.I.C.
Servicing, testing and calibration of different relays, breakers meter all contractor etcand cleaning of carbon shoots from bus bar, breaker, CT & PT chamber etc. for smooth operation of the Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C.
Supply of HSD and lubricants at site including all carriage and storage for running (45 KVA-1no) diesel engine as an when requred as per direction of E.I.C and entry in the log book.
Routine & Periodical inspection by electrical supervisor having valid suprevisor's certificate of competency from directorate of Electricity (Licensing board), Govt. of West Bengal or under any other State Government of India along with Pump Technician / Supervisor for checking of Pumping station, Sub-Station D.G Set, L.T and H.T equipments PDB panel, MCC/ Starter panels for all pumping machineries, indoor & out door lighting , valves with actuators along with all other electro mechanical installation e.g. level indicator, flow meter to keep the system in healthy condition. N.B-Minimun 2 days in a month and each visit should be recorded in the log book (with date and time) to be supplied by the agency and kept in the pump house building .
Supervision charges for Gas Plant by Gas Plant Supervision and the cost of visit charges of the Gas Plant Supervisor at least two day in a month along with expart technician for servision of the installation for the above period as per direction.
Cleaning of Pump House, Substation , Gaseous chlorination plant and its surroundings by engaging sweeper in regular manner by providing all necessary material viz. cotton duster, broom sticks, batteries, carbolic acid, detergent soap, gloves, apron including all tools tackles, etc. required as per direction of E.I.C.
Add: 18% GST
Add: 1% Cess
M/S.S.S.ENTERPRISE (BID ID -6696102)
WEST BENGAL ENGINEERING CO. (BID ID -6684284)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .