| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.7 LAdmitted-Finance SHENAM | -35.00% | ₹13.7 L | L1 | Admitted-Finance |
| 2 | L2₹14.6 L+₹84,362.34 (6.15%)Admitted-Finance 0 SOMA KHANGBU SHEY SHEY ROAD SHEY LEH LADAKH LEH LADAKH 194201 UDYAM LA 02 0005556 | LEH LADAKH | LADAKH | 194201 | -31.00% | ₹14.6 L+₹84,362.34 (6.15%) | L2 | Admitted-Finance |
| 3 | L3₹16.6 L+₹2.8 L (20.8%)Admitted-Finance | -21.50% | ₹16.6 L+₹2.8 L (20.8%) | L3 | Admitted-Finance |
| 4 | L4₹17.0 L+₹3.3 L (23.8%)Admitted-Finance | -19.50% | ₹17.0 L+₹3.3 L (23.8%) | L4 | Admitted-Finance |
| 5 | L5₹17.2 L+₹3.5 L (25.5%)Admitted-Finance | -18.40% | ₹17.2 L+₹3.5 L (25.5%) | L5 | Admitted-Finance |
Tender Value
₹21.1 L
EMD Value
₹42,180
Closing Date
7 May 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer Rnb division Leh
Construction of two additional Classroom at High School Phyang ( by way of wooden, flooring and local toilet )
2026_PWD_18788_1
E Tender 09 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
65 days
Leh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Office of the Executive Engineer Rnb division Leh
₹42,180
9 May 2026
17 Apr 2026
9 May 2026
17 Apr 2026
7 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Polished Granite stone flooring in required design and
patterns, in linear as well as curvilinear portions of the building all complete as
per the architectural drawings with 18 mm thick stone slab over 20 mm (average)
thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with
cement slurry and pointing with white cement slurry admixed with pigment of
matching shade including rubbing , curing and polishing etc. all complete as
specified and as directed by the Engineer-in-Charge.Polished Granite stone slab of all colour and texture except Black, Cherry/Ruby Red | - | cum | - | - |
| - | Providing & fixing 12mm thick pre laminated flooring of approved brand as per direction of Engineer incharge complete job AC-4 including carriage classroom. | - | sqm | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.
All kinds of soil. | - | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Dumping stone including cost of stones in Horizontal on level. | - | cum | - | - |
| - | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | - | cum | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kgs | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form
work for :
Foundations, footings, bases for columns | - | sqm | - | - |
| - | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| - | Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_44891.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .