Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹16,500
Closing Date
21 Sept 2026, 5:00 pmClosed
MC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Laying of paver Block and Construction of Chabutara in Lord Shiva Temple in Vargidih at ward no. 25 Under AMC
2026_UDD_118753_3
UDD/AMC/09/2025-26 2ND CALL
Open Tender
Civil Works
Percentage
120 days
Ward No. 25
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹16,500
Yes
25 Sept 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) …..do….do…..specification and direction of E/I.5.1.1 + 5.1.2 | 23.01 | Per M3 | 167.33 | ₹3,850.26 |
| 2 | Disposal of excavated earth in borrow area of 2 lead 1km(k) +2km(p) (Add 50% extra for loose volume) | 34.51 | Per M3 | 166.07 | ₹5,731.08 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. [3.16- RCD 2023] | 185.76 | Per M3 | 129.9 | ₹24,130.22 |
| 4 | Providing, supplying & spreading stone dust in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I. [RCD 4/M004] | 42.77 | Per M3 | 347.85 | ₹14,877.54 |
| 5 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per specifiacation and direction of E/1.[5.6.3] | 34.53 | Per M2 | 330.81 | ₹11,422.87 |
| 6 | Providing PCC M-20 in nominal mix of (1:1.5:3) in foundation with approved quality of stone-do--- [5.3.1.1] | 8.05 | Per M3 | 4,961.73 | ₹39,941.93 |
| 7 | Providing designation 75 B Brick work in C.M. (1:6) in foundation and plinth …. do….do....[5.2.6] | 8.36 | Per M3 | 5,110.26 | ₹42,721.77 |
| 8 | Providing designation 75 B Brick work in C.M. (1:6) in superstructure. ..do…. [5.2.14] | 6.27 | Per M3 | 5,244.08 | ₹32,880.38 |
| 9 | Plastering of 12 mm thickness with CM (1:6) …do…do…E/I. [5.7.3] | 37.73 | Per M2 | 165.8 | ₹6,255.63 |
| 10 | Providing 1.5 mm cement punning …...do…do… E/I.[5.7.11] | 37.73 | Per M2 | 54.43 | ₹2,053.64 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
terms_conditions.pdf
Tender Documents • 0.37 MB
BOQ_160595.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .