Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.5 Cr | L1 | Accepted-AOC Agreement with L1 |
| 2 | L2₹3.6 Cr+₹4.0 L (1.13%)Rejected-AOC | ₹3.6 Cr+₹4.0 L (1.13%) | L2 | Rejected-AOC Agreement with L1 |
| 3 | L3₹3.6 Cr+₹5.4 L (1.53%)Rejected-AOC | ₹3.6 Cr+₹5.4 L (1.53%) | L3 | Rejected-AOC Agreement with L1 |
| 4 | L4₹3.7 Cr+₹17.4 L (4.90%)Rejected-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹3.7 Cr+₹17.4 L (4.90%) | L4 | Rejected-AOC Agreement with L1 |
| 5 | L5₹3.8 Cr+₹29.8 L (8.41%)Rejected-AOC | ₹3.8 Cr+₹29.8 L (8.41%) | L5 | Rejected-AOC Agreement with L1 |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
8 Apr 2022, 3:00 pmClosed
SE GNSM
Pallavpuram Phase-1
As per NIT
2022_UPIDC_683873_3
03/SE/2021-22
Open Tender
Civil Works - Canal
Piece-work
75 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹9.4 L
28 Apr 2022
2 Apr 2022
8 Apr 2022
2 Apr 2022
8 Apr 2022
2 Apr 2022
Amount
Supplying , filling of HDPE woven bags Confirming to BIS No. 11652-2014 of cement bags size with local Earth in nylon crate & laying in proper position with loading, unloading and carriage i/c cost of material, labour,royalty, T&P etc complete as directed by Engineer in charge
Supplying , Fixing & placing in proper position 1:1.5:3 R.C.C. porcupine i/c cost of material, carriage, labour,royalty, T&P etc complete as directed by Engineer in charge -
Supplying & laying bamboo bracing 6.00 mtr long 60-80 mm dia placing in proper position i/c cost of material, carriage, labour, Taxes, T&P etc complete as directed by Engineer in charge -
Suppying And Filling jhankar & jhua in proper position without boat in dry Carriage up to 5 km i/c cost of material, carriage, labour, T&P etc complete as directed by Engineer in charge -
Supply split / cut stone 20kg to 40 kg at site stock yard i/c loading unloading & stacking cost of material, carriage, labour, royalty, T&P etc complete as directed by Engineer in charge -
Laying packing & pitching of split / cut stone up to 150 m head load i/c cost of material, carriage, labour, royalty, T&P etc complete as directed by Engineer in charge -
Earth Work in cutting or in embankmentin ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20cm layer including ramming & dressing the surface to the required levels & slope i/c 1.50 meter lift & 30 meter lead. The earth from cutting to be used in making embanment or to be deposited as spoil bank within 30 meter distance .dressing and disposal including laying in proper position with loading, unloading and carriage i/c cost of material, labour,T&P etc including all taxes complete as directed by Engineer in charge
MUKESH KUMAR SHARMA
M/s VIJAY ASSOCIATE
M/S AJAY KUMAR
M/S ARUN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .